1. The ideal moisture content range for asphalt aggregate when exiting the
dryer is:
A. Less than 2%
B. Less than 1%
C. Less than 0.5%
D. Less than 0.2%
2. With what frequency must a runway that is cold milled be swept?
A. Once per week
B. Every 48 hours
C. Daily and immediately after milling
D. Only before paving
3. When performing a dry test for soil strength, what size sample should be
used?
A. 2" thick and 4" in diameter
B. 1" thick and 6" in diameter
C. 3" thick and 8" in diameter
D. ½" thick and 5" in diameter
,4. How is level communicated to a machine operator from the ground?
A. Lath
B. Stake flag
C. Grade rod
D. Survey ribbon
5. What type of soil should be considered stable?
A. Silty clay
B. Wet sand
C. Compacted loam
D. Solid rock
6. Who is responsible for supplying water service to current customers while
transferring service to new lines?
A. The foreman
B. The superintendent
C. The engineer
D. The contractor
7. Before entering a manhole or confined space:
A. A fire watch must be present
B. Air quality must be checked
C. Ventilation must be turned off
D. The area must be taped off
8. Who is responsible for opening or closing a utility main?
A. The contractor
B. The project manager
C. The utility
D. The inspector
, 9. When opening a gas main:
A. Any tools used shall be left in the valve for emergency shutoff
B. The valve must be tagged red
C. The main must be vented for 10 minutes
D. The valve must be capped immediately
10.What size pipe is typically used when installing a tapping sleeve for a new
service connection?
A. 1½ inches
B. 2 inches
C. 3 inches
D. 4 inches
11.If there are cable supports in joint lift manholes, what must be allowed?
A. No movement
B. Cable movement without stress
C. Rigid anchoring
D. Tension resistance
12.According to FAA standards, what is the maximum allowable square yards
of aggregate that can be spread before rolling?
A. 500 sq. yd.
B. 1,000 sq. yd.
C. 2,000 sq. yd.
D. 3,000 sq. yd.