Equipment Management} Verified Multiple Choice
and Conceptual Actual Frequently Tested
Exam Questions With Reviewed 100%
Correct Detailed Answers
Guaranteed Pass!!Current Update!!
1. Equipment cost as a percentage of total project cost is approximately how
much higher in heavy construction compared to building construction?
A. 5%
B. 10%
C. 15%
D. 20%
2. Heavy projects tend to be spread out in a horizontal plane, as contrasted
with the vertical nature of a building.
A. False
B. True
C. Sometimes
D. Depends on site conditions
3. Heavy construction is usually performed for a private owner.
A. False
B. True
, C. Sometimes
D. Only for federal projects
4. Many heavy specification elements do not apply to a specific job, so plans
end up governing over specifications.
A. False
B. True
C. Only in federal projects
D. Depends on contractor
5. Heavy work is almost always based on a unit price contract.
A. False
B. True
C. Cost-plus basis
D. Time and material basis
6. Heavy construction plans and specifications are prepared by architects.
A. False
B. True
C. By owners
D. By surveyors
7. GMP stands for:
A. General Management Plan
B. Gross Material Price
C. Guaranteed Maximum Price
D. Government Management Policy