Rutgers Intro to Management Exam #2 questions
with correct answers ( 2025 /2026)
Terms in this set (73)
Discharges of pollutants in storm water associated with
construction activity (storm water discharges) to waters of the
What does this permit regulate?
united states from construction site that disturb one or more
acres of land surface, or that are part of a common plan of
development or sale that disturbs more than one acre of land surface.
The person in charge of the utility LUP
company, municipality, or
other public or private
company or agency that owns
or operates themay also serve
as the
LRP.
Sediment basins, at a minimum, True
shall be designed according to
the CASQA Construction BMP
Guidance Handbook.
In the RUSLE equation, "P" Management operations and support practices.
stands for
Management operations and Management operations and support practices.
support practices.
When does risk level one has to When required for non-visible pollutants.
sample?
ATS instruments shall record Flow, turbidity, and pH
which of the following?
Which factor(s) of RUSLE can K and LS
be based on site-specific
analysis rather than maps?
Failure to obtain coverage under Clean Water Act and California Water Code
the permit for storm water
discharges to waters of the US
is a violation of the
, For traditional construction The person who possesses real properly interest in the land
projects the LRP may be upon which the construction activities will occur for the
regulated site
a measurement of optical properties of a liquid that cause light
What does NTU measure?
rays to be scattered and absorbed rather than transmitted in
straight lines through a sample.
Inspection Records have to be False
kept until the project is
complete or three years,
whichever comes first.
Which factor(s) of RUSLE must R
be changed to recalculate risk
when the construction
duration has changed?
BMP stands for Best Management Practice
Do type 1 LUPs typically No
have a high potential to
impact storm quality?
What does RUSLE stand for? Revised Universal Soil Loss Equation
A discharger must notify the May result in non-compliance
Regional Water Boards if there
are planned changes in the
construction activity that
A rain even that produces 1/2 inch or more of precipitation
A qualifying storm event is
with a period of 48 hours or more between rain events.
Continuous monitoring (no less than 15-min
intervals) of ATS is required for:
Rain Event Action Plan must be False
developed by a QSD
The CGP allows for not Dangerous weather conditions, unsafe storm event, and outside
monitoring under what of scheduled operations.
conditions?
What is the difference between Erosion is the dislodging and transport of soil and
erosion and sedimentation? sedimentation is the deposition of material.
CSMP stands for Construction Site Monitoring Program
What weather forecast 50% chance of rain, within 48 hours.
would trigger a reap?