AND SOLUTIONS RATED A+
✔✔What should initially be done - ✔✔Set boundaries
✔✔The improved jubilee patch - ✔✔294
✔✔What powers an ESP? - ✔✔440v electricity
✔✔If power is lost - ✔✔Fire main pressure
✔✔Who can energize - ✔✔Only a qualified repair party electrician
✔✔What is the maximum pressure for a soft patch? - ✔✔150psi
✔✔What document is used to inventory kits - ✔✔Allowable equipment list
✔✔What is the size of the discharge hose - ✔✔2 1/2 in
✔✔When plugging - ✔✔Below the water line
✔✔What dose PJHS - ✔✔Pipe jumper hoses system
✔✔What document is available in the DCRS? - ✔✔CCOL
✔✔What do you use the sound a tape? - ✔✔Sounding tape
✔✔What is a shole? - ✔✔A flat plate placed under the end of a shore to distribute
pressure
✔✔When determining the need for shoring - ✔✔Wait and see if the structural damage
gets worse
✔✔What is the maximum allowable pressure for a EWARP? - ✔✔150psi
✔✔What are the three types of shoring? - ✔✔IKH
✔✔The secondary purpose of the P 100 is - ✔✔Firefighting
✔✔What is the first thing that should be done during pipe - ✔✔Secure power in flooded
compartment
✔✔To prevent a Crack from progressing - ✔✔1/4