DBIA TEST QUESTIONS AND ANSWERS /. Project Delivery System - Answer-How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) /.Procurement Method - Answer-how team members are selected (QBS, best value, low price, sole source) /.contracting approach - Answer-how team members are paid (fp, gmp, cost reimbursement, target price, unit price) /.Design-Bid-Build (DBB) - Answer-linear, sequential process, A/E selected on qualifications, GC selected on low price, design is fully completed without input from GC, A/E acting in owner's interests, with a historically strong bond, process is well-established and understood /.construction manager at risk - Answer-similar org structure to DBB, construction manager selected by QBS or best value, contractor provides precon services, negotiated gmp contracting approach, open book estimating process, potential to fast track project, construction cost determined before design completed, potential issues over what is reasonably inferable from gmp design documents /.Design-Build - Answer-The owner contracts with one entity (a person or firm) to provide both design and construction services, designer and contractor have a direct contractual relationship, selected by QBS or best value, wide spectrum of contracting approaches and organizational structures, single point responsibility, owner does not manage designer, owner exposure to claims is significantly reduced /.engineer procure construct (epc) - Answer-similar to design build, in industrial and power generation sectors, systems and performance testing are central to scope, contractor will typically perform engineering with its in-house staff, owner has need for single point responsibility, contracts include plant and process performance guarantees, contract items include performance and schedule liquidated damages and limitations of liability /.Multiple Prime Contracting - Answer-owner contracts with multiple trade contractors, attributes are typically similar to dbb, owner's ability to schedule and coordinate the work /.Integrated Project Delivery (IPD) - Answer-multi-party agreement - all parties equal, QBS procurement and target pricing contract approach, private sector use (limited at this time), key: owner's ability to accept risk /.public-private partnership (p3) - Answer-Instead of government building and maintaining major infrastructure (such as highway, water treatment plant), build and maintenance is outsourced to a private company. Opposed by public sector unions. this is not considered a delivery system but its underlying approaches are delivery systems and typically use DB. multiple procurement and contracting approaches /.shift left - Answer-intense efforts to establish scope early in the process; drives early team formation to include key trade subcontractors; can enable big decisions to be made early, affect project outcomes at lowest cost, establish a need for co-location and collaboration, and compress time during concurrent design and construction /.traditional design build - Answer-typically two-phase best value procurement with lump sum contract; owner defines project requirements and scope of prescriptive work; use of performance-based technical requirements with limited prescriptive specifications /.progressive design build - Answer-design and price are progressively developed after the design-builder is under contract; final project cost and schedule commitment is not established as part of the selection process; two phases: preliminary services and final design and construction services /.criteria documents - Answer-describe the end result /.bridging documents - Answer-prescribes how to achieve the end result /.design bid build paradigm - Answer-prior to bidding, owner undertakes a process to design the project and all of its details to 100% complete plans and specs. the owner is therefore responsible for success or failure of details of the design, and warrants the sufficiency of design to the contractor. the owner is therefore liable to the contractor for any gaps between plans and specifications and owner's requirements for project performance /.design details responsibility - Answer-the owner should define its performance requirements and award the contract on the basis of preliminary design; this makes the design-builder responsible for completing the design in accordance with the owner's performance requirements. that also causes the design-builder to warrant the sufficiency of the design to meet the owner's criteria and the sufficiency of the design to subcontractors/suppliers that have no design responsibility

Show more Read less
Institution
DBIA
Course
DBIA

Content preview

DBIA TEST QUESTIONS AND ANSWERS



/. Project Delivery System - Answer-✅How team members are organized, establishes
when parties engage, determines roles of parties, and determines sequence of design,
procurement, and construction (db, cmar, dbb)

/.Procurement Method - Answer-✅how team members are selected (QBS, best value,
low price, sole source)

/.contracting approach - Answer-✅how team members are paid (fp, gmp, cost
reimbursement, target price, unit price)

/.Design-Bid-Build (DBB) - Answer-✅linear, sequential process, A/E selected on
qualifications, GC selected on low price, design is fully completed without input from
GC, A/E acting in owner's interests, with a historically strong bond, process is well-
established and understood

/.construction manager at risk - Answer-✅similar org structure to DBB, construction
manager selected by QBS or best value, contractor provides precon services,
negotiated gmp contracting approach, open book estimating process, potential to fast
track project, construction cost determined before design completed, potential issues
over what is reasonably inferable from gmp design documents

/.Design-Build - Answer-✅The owner contracts with one entity (a person or firm) to
provide both design and construction services, designer and contractor have a direct
contractual relationship, selected by QBS or best value, wide spectrum of contracting
approaches and organizational structures, single point responsibility, owner does not
manage designer, owner exposure to claims is significantly reduced

/.engineer procure construct (epc) - Answer-✅similar to design build, in industrial and
power generation sectors, systems and performance testing are central to scope,
contractor will typically perform engineering with its in-house staff, owner has need for
single point responsibility, contracts include plant and process performance guarantees,
contract items include performance and schedule liquidated damages and limitations of
liability

/.Multiple Prime Contracting - Answer-✅owner contracts with multiple trade contractors,
attributes are typically similar to dbb, owner's ability to schedule and coordinate the
work

, /.Integrated Project Delivery (IPD) - Answer-✅multi-party agreement - all parties equal,
QBS procurement and target pricing contract approach, private sector use (limited at
this time), key: owner's ability to accept risk

/.public-private partnership (p3) - Answer-✅Instead of government building and
maintaining major infrastructure (such as highway, water treatment plant), build and
maintenance is outsourced to a private company. Opposed by public sector unions. this
is not considered a delivery system but its underlying approaches are delivery systems
and typically use DB. multiple procurement and contracting approaches

/.shift left - Answer-✅intense efforts to establish scope early in the process; drives early
team formation to include key trade subcontractors; can enable big decisions to be
made early, affect project outcomes at lowest cost, establish a need for co-location and
collaboration, and compress time during concurrent design and construction

/.traditional design build - Answer-✅typically two-phase best value procurement with
lump sum contract; owner defines project requirements and scope of prescriptive work;
use of performance-based technical requirements with limited prescriptive specifications

/.progressive design build - Answer-✅design and price are progressively developed
after the design-builder is under contract; final project cost and schedule commitment is
not established as part of the selection process; two phases: preliminary services and
final design and construction services

/.criteria documents - Answer-✅describe the end result

/.bridging documents - Answer-✅prescribes how to achieve the end result

/.design bid build paradigm - Answer-✅prior to bidding, owner undertakes a process to
design the project and all of its details to 100% complete plans and specs. the owner is
therefore responsible for success or failure of details of the design, and warrants the
sufficiency of design to the contractor. the owner is therefore liable to the contractor for
any gaps between plans and specifications and owner's requirements for project
performance

/.design details responsibility - Answer-✅the owner should define its performance
requirements and award the contract on the basis of preliminary design; this makes the
design-builder responsible for completing the design in accordance with the owner's
performance requirements. that also causes the design-builder to warrant the
sufficiency of the design to meet the owner's criteria and the sufficiency of the design to
subcontractors/suppliers that have no design responsibility

Written for

Institution
DBIA
Course
DBIA

Document information

Uploaded on
October 24, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainariam Harvard University
Follow You need to be logged in order to follow users or courses
Sold
148
Member since
1 year
Number of followers
7
Documents
8376
Last sold
1 week ago

Our store offers a wide selection of materials on various subjects and difficulty levels, created by experienced teachers. We specialize on NURSING,WGU,ACLS USMLE,TNCC,PMHNP,ATI and other major courses, Updated Exam, Study Guides and Test banks. If you don't find any document you are looking for in this store contact us and we will fetch it for you in minutes, we love impressing our clients with our quality work and we are very punctual on deadlines. Please go through the sets description appropriately before any purchase and leave a review after purchasing so as to make sure our customers are 100% satisfied. I WISH YOU SUCCESS IN YOUR EDUCATION JOURNEY

Read more Read less
3.3

25 reviews

5
8
4
2
3
8
2
3
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions