What is the purpose of installing Separate hoist lines 3 multiple choice options
an
auxiliary boom point sheave to
the main boom tip?
A designated Lift Director shall Site Supervisor 3 multiple choice options
be assigned by the ?
Who is responsible for Crane Operator 3 multiple choice options
calculating net capacity?
Who is responsible for Site Supervisor/ Lift Director 3 multiple choice options
ensuring all rigging is
supervised by a Qualified
Rigger?
Who is responsible for ensuring Crane User 3 multiple choice options
the crane owner is notified of
any damage to the
crane or replacement/repair of
wire rope?
Who is responsible for Site Supervisor/Lift Director 3 multiple choice options
restricting unauthorized access
to the crane's work area?
Who is responsible for ensuring Crane User 3 multiple choice options
the crane owner is notified of
any damage to the
crane or replacement/repair of
wire rope?
Who is responsible for Lift Director 3 multiple choice options
ensuring crane operations are
stopped if alerted to an unsafe
condition?
, If the operator or A/D determine Controlling Entity 3 multiple choice
that options
ground conditions are not
suitable for the equipment
being operated, they should
request the__correct the
issue
Who is responsible for ensuring Lift Director 3 multiple choice
that options
personnel involved in crane
operations
understand their responsibilities,
assigned duties and associated
hazards?
When can the operator of a crane When the load chart allows 3 multiple choice
set the crane up with less than options
fully extended
outriggers?
The outrigger pad and cribbing The total weight of the crane and the load 3 multiple choice
should be strong enough to options
support?
What must be known prior to Location of underground vaults 3 multiple choice
setting up your crane? options
What is the minimum distance ½ inch 3 multiple choice
the flange on the hoist drum options
should extend above the last
wrap of rope?
Eccentric main boom tip reeving Twisting of the boom 3 multiple choice
will options
What is the most common wire Right regular lay 3 multiple choice
rope used on most cranes? options
Prior to leveling a crane what Secure the float pad to jack cylinder 3 multiple choice
should be done with the options
outrigger jack?
What three functions will not Boom down, extend the boom and hoist 3 multiple choice
work after two-blocking a crane options
that has a prevention system?
Boom angle on a telescoping boom Longitudinal axis of the boom base 3 multiple choice
is section options
measured from above or below