C-10 Electrical Part 1 Exam | California
Electrical Contractor License Test||
GRADED A+|| LATEST UPDATE 2025/26
1. Takeoffs of conduit are categorized into ______. -CORRECTANSWER Power
distribution, branch lighting, and branch power
2. Raceways are taken off per _____. Fittings required to make turns and extensions
are taking off per _____. -CORRECTANSWER Linear foot, each
3. All wires and conductors are taken off per _____. -CORRECTANSWER Linear foot
4. All fittings, devices and boxes are taken off per _____. -CORRECTANSWER Each
Item
5. Permits and fees for tie-ins may be listed at lump sum and are taken off per _____. -
CORRECTANSWER Occurrence,Project, and Contract
6. Control stations are taken off by _______. -CORRECTANSWER Individual Unit and
Each Item.
7. Panelboards are taken off individually according to ______. -CORRECTANSWER
Type, Size, and Voltage
,8. Starters, safety switches and fuses are taken off per _______. -CORRECTANSWER
Each Item
9. _______ should be kept separate from general light fixtures. -CORRECTANSWER
Exit Lighting
10. Interior and exterior lighting should be taken off and listed _______. -
CORRECTANSWER Separately
11. Lamps for light fixtures are _______. -CORRECTANSWER Taken off per each Item
12. Light fixtures should be listed in the takeoff according to _______. -
CORRECTANSWER Color
13. Working electrical drawings numbered sequentially, prefaced by the letter "E",
include _______. -CORRECTANSWER Telecommunications and security systems only
14. The _______ shows power requirements of the structure. -CORRECTANSWER
Power plan
15. The _______ aids the electrical contractor sizing the panel. -CORRECTANSWER
Panel Schedule
, 16. The _______ plan is supplemented by the fixture schedule. -CORRECTANSWER
Lighting
17. The fixture schedule lists lamp _______. -CORRECTANSWER Wattage
18. Electrical specifications provide _______. -CORRECTANSWER The grade of
materials to be used, Materials installation specifics, and how materials will be used in
the finished system
19. _______ must be maintained by the electrical contractor for all installed work. -
CORRECTANSWER As-built drawings
20. No conductors are smaller than No. _______ wire. -CORRECTANSWER 12
21. _______ Shall be installed in service entrances and panel feeders. -
CORRECTANSWER Rigid conduit
22. The electrical contractor is responsible for providing and installing _______ for a
complete telephone system. -CORRECTANSWER Outlet boxes, pull boxes, and empty
raceways
Electrical Contractor License Test||
GRADED A+|| LATEST UPDATE 2025/26
1. Takeoffs of conduit are categorized into ______. -CORRECTANSWER Power
distribution, branch lighting, and branch power
2. Raceways are taken off per _____. Fittings required to make turns and extensions
are taking off per _____. -CORRECTANSWER Linear foot, each
3. All wires and conductors are taken off per _____. -CORRECTANSWER Linear foot
4. All fittings, devices and boxes are taken off per _____. -CORRECTANSWER Each
Item
5. Permits and fees for tie-ins may be listed at lump sum and are taken off per _____. -
CORRECTANSWER Occurrence,Project, and Contract
6. Control stations are taken off by _______. -CORRECTANSWER Individual Unit and
Each Item.
7. Panelboards are taken off individually according to ______. -CORRECTANSWER
Type, Size, and Voltage
,8. Starters, safety switches and fuses are taken off per _______. -CORRECTANSWER
Each Item
9. _______ should be kept separate from general light fixtures. -CORRECTANSWER
Exit Lighting
10. Interior and exterior lighting should be taken off and listed _______. -
CORRECTANSWER Separately
11. Lamps for light fixtures are _______. -CORRECTANSWER Taken off per each Item
12. Light fixtures should be listed in the takeoff according to _______. -
CORRECTANSWER Color
13. Working electrical drawings numbered sequentially, prefaced by the letter "E",
include _______. -CORRECTANSWER Telecommunications and security systems only
14. The _______ shows power requirements of the structure. -CORRECTANSWER
Power plan
15. The _______ aids the electrical contractor sizing the panel. -CORRECTANSWER
Panel Schedule
, 16. The _______ plan is supplemented by the fixture schedule. -CORRECTANSWER
Lighting
17. The fixture schedule lists lamp _______. -CORRECTANSWER Wattage
18. Electrical specifications provide _______. -CORRECTANSWER The grade of
materials to be used, Materials installation specifics, and how materials will be used in
the finished system
19. _______ must be maintained by the electrical contractor for all installed work. -
CORRECTANSWER As-built drawings
20. No conductors are smaller than No. _______ wire. -CORRECTANSWER 12
21. _______ Shall be installed in service entrances and panel feeders. -
CORRECTANSWER Rigid conduit
22. The electrical contractor is responsible for providing and installing _______ for a
complete telephone system. -CORRECTANSWER Outlet boxes, pull boxes, and empty
raceways