Answers
Terms in this set (60)
Production Process: A BOM
production order typically Routi
includes references to which ng
of the following? (3 Correct PRT
answers)
Production Process: Periodic Settlement
processing in the production Work in progress determination
process includes which of the
following? Two correct
answers.
Material Planning: MRP The production control technique used to plan requirements.
type specifies _. (One
correct answer)
How many units of a product
Material Planning: A are needed c.
planned order is a formal What materials are
request that indicates (3 needed e.
correct answers) When the materials are needed
Production Process: BOM are Sales and Fulfillment
used in all of the following
EXCEPT:
One correct answer.
Production Process: Which of A goods receipt is automatically recorded
the following is not an outcome
of a goods issue to a
production order? One correct
answer.
Material Planning: Which one of Component materials are moved from storage and prepared for use
the
following best defines material
staging? One correct answer.
, Material Planning: Which of Forecast-based planning, time-phased planning, reorder-point planning
the following options
represents categories of
consumption-based planning?
One correct answer.
Material Planning: Which of Externally from a vendor
the following are strategies for
acquiring materials? 2 correct Internally from another plant
answers
What materials are
Material Planning: Material required? b.
planning is concerned with When are materials
answering which basic required? c.
questions? 3 correct answers What quantities of materials are required?
Production Process: At what When production order is released
stage are shop floor documents
are printed during a
Production Process? One correct
answer.
Production Process: Goods Production order is released.
movements are not possible
during a Production Process
until which one of the
following occurs? One
correct answer.
Material Planning: Which of Changes to MRP element
the following is most likely to
trigger the MRP process?
One correct answer.
Monitors material availability.
Material Planning: The MRP
controller Uses variety of reports and makes adjustments to
_____. (2 correct answers) procurement proposals, as needed.
Which of the following does a The location where operations are to be
routing identify in a production performed The operations needed to
order? (2 Correct answers) produce a material
Material Planning: Which of Bills of
the following are master data material e.
relevant to material Material master
planning? 2 correct answers
Production Process: In Routing