CESSWI EXAMINATION QUESTIONS WITH VERIFIED
A+ ANSWERS LATEST UPDATE//2025-2026 ED
Terms in this set (223)
Existing Veg, Desc/Purp temp or perm bmp desi to stab soil and remove sups part from sheet
flow runoff.
1) Site Plan and Mang
2) Erosi Cont
Existing Veg, Objectives
3) Sedi Cont
4) Post-Cons Mang
1) Areas within site where no const activity is occur
Existing Veg, applic 2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and storm
water quality.
1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
Existing veg: inspection
5) adequate cover
6) debris and litter
7) invasive exotics
1) only disturb area for construct
2) irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
Existing veg: maint
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species
, Temp, procedural control that involves creating a written plan to address neck
Sched/Sequ, purp/descrip bmps and sequencing of construct activities to mitigate the erosive effects of
wind,water and construct activities.
1) site planning & management
Sched/Sequ: object 2) erosion control
3) sediment control
Sched/Sequ: applications 1) develop timetables for certain activities, paretic during rainy season
1) inclusion of sched/seq as a bmp in the plan
Sched/Sequ: inspect
2)ached site activities mirroring ached activites.
1) modify ached of active when changes are warranted
Sched/Sequ: maintanence
2)modify ached of active prior to rainy season to reflect updated bmp info
Temp or perm bmp designed to reduce erosion and runoff by applying mix of
Hydroseed: Des& purp
seed, fert and stabilizing emulsion.
1) erosion control
Hydroseed: object 2)good housekeeping/ materials management
3) post construct management
1) sediment
2) nutrients
Hydroseed: targeted pollut
3) metals
4) ph
1) need adequate moisture
2)additional mulch may be added
Hydroseed: imp consid
3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
1) seed mix approp for seasonal conditions
2)time of application per seasonal conditions
Hydroseed: limitations 3) difficult on steep slopes
4) no pedestrian or vehicle traffic
5) avoid high winds
1) adequate coverage of diet areas
2) signs of pedest or vehicle traffic
Hydroseed: inspect:
3) signs of animal activity
4) check seed mix for correct type and application rate
1) reapply in areas needing more cover
2) insure proper moisture
Hydroseed: Maint
3) maintain unbroken coverage through out project
4) require repair due to traffic or animals
1) hydromulch
2) seeding
Hydroseed: potentailly assoc bmps 3) mulching
4) temp stabi
5) tackifiers
temp or perm erosion control blankets that act as soils stabilization devices to
RCP: descript and purp
protect diet areas from erosions.
1) erosion control
RCP: object 2)runoff control
3) post construct
RCP: target pollutants 1) sediment