These procedures for capping Planeness, perpendicularity
enable concrete cylinders and
cores to meet
the standard's requirements for
and .
Equipment needed for the Plates, alignment, melting
capping process includes
capping ,
devices, and pots.
Plates for neat cement and Glass, metal granite or diabase
high strength gypsum plaster
caps should be made of ,,
or .
Sulfur mortar cap plates Metal, Stone
should be formed against
or
plates.
The purpose of the guide bar True
or bull's eye level is to ensure
that caps remain
perpendicular to the axis of
the cylinder within 0.5
degrees. True or False?
To avoid accidents during Peripheral heating
reheating of cooled sulfur,
use melting pots that have .
The technician should use a stiff Neat cement paste
layer of
to cap fresh concrete
cylinders.
Hardened concrete cylinders High-strength gypsum paste, neat cement paste, or sulfur mortar
should be capped with ,
or .
Plaster of paris and mixtures False
of plaster of paris and
portland cement are examples
of suitable high strength
plasters. True or False?
Sulfur mortars and high- 35MPa (5000 psi), the cylinder strength
strength gypsum cement
https://quizlet.com/1047113432/aci-concrete-strength-testing-technician-test-exam-2025-newest-complete-exam-questions-with-detailed-verified-answ… 1/
14
, cubes must demonstrate a
minimum compressive
strength of or ,
whichever is greater.
The cement paste should be 2,4, settling
applied to the freshly molded
cylinder from
to hours after molding.
This is to allow for
of the concrete specimen.
The strength of the paste a, b and d
depends on:
a) the water-cement ratio
b) time
c) the equipment used
d) type of cement