Explain your responsibility for safety on a job site
Give this one a try later!
, - Examine work conditions, ensure conformance with OSHA
- Minimize, reduce hazards, use warning signs, means of egress
- Provide training, inform employees of OSHA rights
- Establish safety & health operating procedures & first aid
- Ensure use of proper PPE
- Keep OSHA records; post OSHA citations until abated
Identify the critical path of a project
Give this one a try later!
Order of events that have 0 float
Differentiate between patent and latent defects related to a capital project
Give this one a try later!
Patent - obvious mistakes/errors, usually found early in project
Latent - after the fact errors that take time so float to the surface
Identify the main project documents for project closeout
Give this one a try later!
- AF 1477 construction inspection report
- AF3000 material approval; submittal
- DD Form 1354 Transfer and Acceptance of RP
- Final Acceptance Letter
, - DD 2626, performance eval
- Keep Project folders open for 1 year after acceptance
Explain the lifecycle impact of scope changes on project management goals
Give this one a try later!
As stages of the project progress, the level of influence and cost a change
order can make on the project increases.
Conversely, early in the project, it is easier and cheaper to make changes.
Identify Unauthorized commitments and Ratifications
Give this one a try later!
Unauthorized Commitments:
An agreement with a company that is not binding bc the gov't rep who
made it lacked the authority
Individual can be held financially liable
Ratifications:
The act of legalizing an unauthorized commitment
Describe the attributes of a Multiple Award Construction Contract (MACC)
Give this one a try later!
, - IDIQ contract
--> Requirements competed among pool of multiple awardees based on
individual task order defined work
--> Solicit RFP from a base project, review and select awardees
- May be multi-disciplined general construction work
- May involve design services
--> Construction
--> Modification
--> Renovation
--> May augment or replace SABER- Very Flexible!
- Work does not have to be equitably distributed to the MACC awardees
- As long as minimum guaranteed awards are met, work can go to the best
awardee for each project
- Process:
--> Government issues RFP
--> Site visit scheduled for verification
--> All MACC awardees should attend
--> Government reviews the pre-approved contractor proposals based on
award criteria
- DO is a firm fixed price (sort of DB type contract)
Identify the contracting process
Give this one a try later!
Give this one a try later!
, - Examine work conditions, ensure conformance with OSHA
- Minimize, reduce hazards, use warning signs, means of egress
- Provide training, inform employees of OSHA rights
- Establish safety & health operating procedures & first aid
- Ensure use of proper PPE
- Keep OSHA records; post OSHA citations until abated
Identify the critical path of a project
Give this one a try later!
Order of events that have 0 float
Differentiate between patent and latent defects related to a capital project
Give this one a try later!
Patent - obvious mistakes/errors, usually found early in project
Latent - after the fact errors that take time so float to the surface
Identify the main project documents for project closeout
Give this one a try later!
- AF 1477 construction inspection report
- AF3000 material approval; submittal
- DD Form 1354 Transfer and Acceptance of RP
- Final Acceptance Letter
, - DD 2626, performance eval
- Keep Project folders open for 1 year after acceptance
Explain the lifecycle impact of scope changes on project management goals
Give this one a try later!
As stages of the project progress, the level of influence and cost a change
order can make on the project increases.
Conversely, early in the project, it is easier and cheaper to make changes.
Identify Unauthorized commitments and Ratifications
Give this one a try later!
Unauthorized Commitments:
An agreement with a company that is not binding bc the gov't rep who
made it lacked the authority
Individual can be held financially liable
Ratifications:
The act of legalizing an unauthorized commitment
Describe the attributes of a Multiple Award Construction Contract (MACC)
Give this one a try later!
, - IDIQ contract
--> Requirements competed among pool of multiple awardees based on
individual task order defined work
--> Solicit RFP from a base project, review and select awardees
- May be multi-disciplined general construction work
- May involve design services
--> Construction
--> Modification
--> Renovation
--> May augment or replace SABER- Very Flexible!
- Work does not have to be equitably distributed to the MACC awardees
- As long as minimum guaranteed awards are met, work can go to the best
awardee for each project
- Process:
--> Government issues RFP
--> Site visit scheduled for verification
--> All MACC awardees should attend
--> Government reviews the pre-approved contractor proposals based on
award criteria
- DO is a firm fixed price (sort of DB type contract)
Identify the contracting process
Give this one a try later!