AIC EXAM AND PRACTICE EXAM NEWEST 2025/2026
COMPLETE 250 QUESTIONS AND 100%CORRECT
DETAILED ANSWERS |ALREADY GRADED
A+|NEWEST UPDATE
Which of the following is a management system used to
improve customer satisfaction? - ANSWER-TQM, Six
Sigma, Lean ((All of the above))
Which management system was developed based on
Toyota's Production System? - ANSWER-Lean
Which of the following should a construction professional
provide when delivering services to his or her clients
,2|Page
based on the AIC code of ethics? - ANSWER-
Management Excellence
The owner wants to fast-track a construction project.
Which project delivery system best supports this process?
- ANSWER-Design-Build
A contract is entered into in which the design and scope
are undefined and owner agrees to pay for all direct labor,
materials, equipment, plus an agreed upon fee to the
contractor for their services. What is this type of contract
called? - ANSWER-Cost Plus
,3|Page
A contract is entered into in which the owner holds a
contract with the architect and each trade contractor. In
addition, the owner holds a contract with a management
service company to perform the trade coordination, cost
control, and scheduling services. What is this project
delivery method called? - ANSWER-Construction
Management
Which legal entity is considered perpetual (never ending)?
- ANSWER-Corporation
Under which municipal law are corporations formed? -
ANSWER-State
, 4|Page
Which law establishes basic rules governing the sale of
goods used to establish a purchase order? - ANSWER-
Uniform Commercial Code
Which graphical measurement tool is a bar chart that
displays a frequency distribution? - ANSWER-Histogram
Which of the following principles of law states that if the
prime contractor reasonably relies on the promise or price
of the subcontractor to its detriment, then the
subcontractor must be held to its promise to avoid harm to
the prime contractor even though a signed contract
between the contractor and subcontractor does not exist
at the bidding phase of a project? - ANSWER-Promissory
Estoppel