QUESTIONS WITH VERIFIED ANSWERS NEW
MODIFIED TESTED AND APPROVED 2026 LATEST
UPDATE
What are two ways that architecture and infrastructure are handled in scrum?
(Choose the best two answers)
A) They are built by a separate team through the creation of an architectural
runway
B) They are implemented along with functional development of the product
C) They are discussed, determined and documented before the actual feature
development Sprints
D) They are added to the Product Backlog and addressed in early Sprints while
always requiring at least some business functionality, no matter how small --
CORRECT ANSWER--B D
A Scrum team is only allowed to meet with stakeholders during Sprint review.
A) True
B) False --CORRECT ANSWER--B
Page 1 of 69
,During a Sprint, when is new work or further decomposition of work added to
the Sprint Backlog?
Choose the best answer
A) As soon as possible after they are identified
B) When the Product Owner identifies new work
C) During the daily Scrum after the Development Team approves them
D) When the Scrum Master has time to enter team --CORRECT ANSWER--A
During a Sprint retrospective, for what is the Product Owner responsible?
Choose the best answer
A) Capturing requirements for the Product Backlog
B) Participating as a scrum team member
C) Summarizing and reporting the discussions to the stakeholders that he/she
represents in the scrum team
D) The Product Owner should not take part in Sprint retrospectives --
CORRECT ANSWER--B
Page 2 of 69
,You are the Scrum Master of a new to be developed product. Development is
going to require 45 people. What is a good first question for you to suggest the
group thinks about when forming into teams?
Choose the best answer
A) What is the right mixture of senior and junior people on each team?
B) How will we make sure all teams have the right amount of expertise?
C) Who are the subject matter experts on each team?
D) Who are going to be the team leads? --CORRECT ANSWER--B
What is a Development Team responsible for?
Choose the best 2 answers
A) Selecting the Product Owner
B) Resolving internal team conflicts
C) Reporting productivity
D) Organizing the work required to meet the Sprint goal --CORRECT
ANSWER--B D
Page 3 of 69
, Five new Scrum teams have been created to build one product. A few of the
developers on one of the dev. teams ask the Scrum Master how to coordinate
their work with the other teams. What should the Scrum Master do?
Choose the best answer
A) Visit the five teams each day to inspect that their Sprint Backlogs are aligned
B) Teach them that it is their responsibility to work with the other teams to
create an integrated [potentially releasable] increment
C) Teach the Product Owner to work with the lead developers on ordering
Product Backlog in a way to avoid too much technical and development overlap
during a sprint
D) Collect the Sprint tasks from the teams at the end of their Sprint Planning
and merge that into a consolidated plan for the entire Sprint Planning --
CORRECT ANSWER--B
Which of the following is required by Scrum?
Choose all that apply
A) Sprint retrospective
B) Members must stand up at the daily Scrum
C) Sprint burndown chart
D) Release planning
Page 4 of 69