Low Pressure Boiler COF NY Questions
with 100% Correct Answers
A fill line in an oil burner system is a line used to: Correct Answer: Fill the storage
tank with oil.
The aquastat is located Correct Answer: Below the water line.
All heating, combustion, and cooking equipment shall be installed with
adequate clearances from _______ construction. Correct Answer: Combustible
The equipment must be provided with ______ or the building construction shall
be _____ _____. Correct Answer: Insulation.
Fire Protected
During operation the surface of combustible construction materials will not be
raised to a temp higher than _____ degrees F. Correct Answer: 170 degrees
Equipment shall be so that the means of access for ordinary operation and
maintenance will not be _______. Correct Answer: Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and
an equipment ____ _____ has been issued by the ______. Correct Answer:
Inspected and tested.
Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a _____
including chimney connections. Correct Answer: Once a year
, Owners Annual Statement: The owner of each boiler shall file an _____ written
statement with the ________, specifying the _____of each boiler and ______ for
inspection. Correct Answer: Annual, commissioner, location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by
the ______ before the system is operated. Correct Answer: Hydrostatically,
contractor
The piping shall be tested at _____ times the max working pressure applicable to
that part of the piping system but at a pressure ____ than the test pressure
required for the storage tank. Correct Answer: 1/2, less
The min pressure for testing tanks shall be ____ times the max working pressure
but in no case less than ____ psi. Correct Answer: 1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____ have been
visually inspected for ___, but in no case less than _____ hour. Correct Answer:
Joints, connections, leaks, 1/2 hour.
A record must be kept of the pressure test showing the name of the _____ and
the _____ at which the piping and tank were tested. Correct Answer:
Contractor, pressure
Gas piping must be tested by the _____ before operation. Correct Answer:
Contractor
For oil burning systems, ____ ____ giving instructions for the care and operation of
the system shall be permanently located in an easily _____ and _____ location
near the equipment. Correct Answer: Instruction Cards, visible, accessible
No oil burning equipment shall be operated until an equipment ____ _____ has
been issued by the commissioner, the requirements of the ____ ____ control
code have been met and until the approval for the storage of ____ ____ has
with 100% Correct Answers
A fill line in an oil burner system is a line used to: Correct Answer: Fill the storage
tank with oil.
The aquastat is located Correct Answer: Below the water line.
All heating, combustion, and cooking equipment shall be installed with
adequate clearances from _______ construction. Correct Answer: Combustible
The equipment must be provided with ______ or the building construction shall
be _____ _____. Correct Answer: Insulation.
Fire Protected
During operation the surface of combustible construction materials will not be
raised to a temp higher than _____ degrees F. Correct Answer: 170 degrees
Equipment shall be so that the means of access for ordinary operation and
maintenance will not be _______. Correct Answer: Hazardous
Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and
an equipment ____ _____ has been issued by the ______. Correct Answer:
Inspected and tested.
Use permit, commissioner
Periodic Inspections: All boilers must be inspected at least _____ a _____
including chimney connections. Correct Answer: Once a year
, Owners Annual Statement: The owner of each boiler shall file an _____ written
statement with the ________, specifying the _____of each boiler and ______ for
inspection. Correct Answer: Annual, commissioner, location, arrangement.
Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by
the ______ before the system is operated. Correct Answer: Hydrostatically,
contractor
The piping shall be tested at _____ times the max working pressure applicable to
that part of the piping system but at a pressure ____ than the test pressure
required for the storage tank. Correct Answer: 1/2, less
The min pressure for testing tanks shall be ____ times the max working pressure
but in no case less than ____ psi. Correct Answer: 1 1/2, 25 psi
The hydrostatic pressure must be maintained until all ____ and _____ have been
visually inspected for ___, but in no case less than _____ hour. Correct Answer:
Joints, connections, leaks, 1/2 hour.
A record must be kept of the pressure test showing the name of the _____ and
the _____ at which the piping and tank were tested. Correct Answer:
Contractor, pressure
Gas piping must be tested by the _____ before operation. Correct Answer:
Contractor
For oil burning systems, ____ ____ giving instructions for the care and operation of
the system shall be permanently located in an easily _____ and _____ location
near the equipment. Correct Answer: Instruction Cards, visible, accessible
No oil burning equipment shall be operated until an equipment ____ _____ has
been issued by the commissioner, the requirements of the ____ ____ control
code have been met and until the approval for the storage of ____ ____ has