The purpose of Construction Quality Management is to: - .
. ANSWER ✔ ✔Achieve the quality established by
properly developed requirements through the combined
responsibility, but seperate efforts of contractpr smd
government personnel.
Construction Quality Management is the performance of
tasks, which ensure that construction is performed. - . .
ANSWER ✔ ✔According to plans and specifications, on
time, within a defined budget and a safe work
environment.
Partnering relationships are based upon: - . . ANSWER
✔ ✔Building trust and dedication to common goals
It is the responsibility of Quality Assurance Personnel to: -
. . ANSWER ✔ ✔Periodically verify that the contractors
system of control is working effectively.
,2|Page
An effective contractor quality control program will: - . .
ANSWER ✔ ✔Be an incentive for work to be done
correctly the first time resulting in earlier completion,
reduced field overhead costs, and greater profits.
The success or failure of all contractors is based upon: - . .
ANSWER ✔ ✔The ability to control costs, finance work,
estimate jobs, schedule the work, and maintain effective
quality control.
Quality Assurance Personnel have the responsibility to: - . .
ANSWER ✔ ✔Require contractors to maintain the
quality specified in the plans and specifications.
Inspection is: - . . ANSWER ✔ ✔The process by which
ongoing and completed work is examined
During the punch-out inspection of a project: - . .
ANSWER ✔ ✔Quality Assurance Personnel must
assure that the contractor prepares a punch-list and makes
corrections.
, 3|Page
If there is a disagreement whether the contractors work
complies with the contract: - . . ANSWER ✔ ✔The
government makes the final determination
Characteristics that describe a definable feature of work
include: - . . ANSWER ✔ ✔Cross-referenced listings to
the contractors construction schedule that may have more
than one definable feature under a section of the
specifications.
The _____________________ consists of daily checks
of the work to assure continuing compliance with contract
requirements. - . . ANSWER ✔ ✔Follow-up phase
The Quality Assurance Plan: - . . ANSWER ✔ ✔Is a
government management tool establishing staffing,
training, pre-award activities, and surveillance activities.
Testing is extremely important in construction quality
management and is performed by: - . . ANSWER ✔
✔Both the contractor and the government
If the contractor does not provide an adequate
superintendent, the contract allows the contracting officer