D 469 / D469 PRE - ASSESSMENT & FINAL EXAM
(LATEST UPDATES STUDY BUNDLE
PACKAGE WITH SOLUTIONS) QUALITY, CONTINUOUS
IMPROVEMENT AND LEAN SIX SIGMA | QUESTIONS
AND ANSWERS | GRADE A | 100% CORRECT
(VERIFIED ANSWERS) - WGU
A White Box refers to? .....ANSWER.....a space in a commercial
building
A condition that is "Grandfathered" can always stay is it is met
by code. .....ANSWER.....False
Existing conditions will rarely have an impact on final design.
.....ANSWER.....False
Name 2 ways a Zoning Ordinance might affect your design
when working on an existing building. .....ANSWER.....signage,
occupancy, and setbacks
, Page 2 of 10
In Base Building, permanent elements that have an impact
.....ANSWER.....MEP
Structural Elements
sprinkler systems
openings in walls
ceiling heights
"All it takes is time and money" this decision is based on?
.....ANSWER.....cost vs. benefit - does the cost justify the benefit
Prior to design, we take steps to understand an existing building
like? .....ANSWER.....All of the Above
A typical small HVAC system is shown the system is called
.....ANSWER.....split system
The split system shows .....ANSWER.....Ducts
heater