Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

WGU C215 Study Guide – Final Exam||Questions with Correct Answers||Latest exam Update||Download Now||

Rating
-
Sold
-
Pages
18
Grade
A+
Uploaded on
02-11-2025
Written in
2025/2026

WGU C215 Study Guide – Final Exam||Questions with Correct Answers||Latest exam Update||Download Now||

Institution
Course

Content preview

WGU C215 Study Guide – Final
Exam||Questions with Correct
Answers||Latest exam
Update||Download Now||
Total Quality Management (TQM) Philosophy -CORRECT ANSWER 1. customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality

Process Capability Index (Cpk) -CORRECT ANSWER Basic function of Six Sigma.
Measures the process potential and performance of processes. The higher the range of
Cpk, the improved is the ability of the process to complete its necessities.

Six Sigma -CORRECT ANSWER A disciplined, data-driven approach and methodology
for eliminating defects (driving toward six standard deviations between the mean and
the nearest specification limit) in any process - from manufacturing to transactional and
from product to service.

Design Capacity -CORRECT ANSWER The theoretical maximum output of a system in
a given period under ideal conditions.

Location Analysis -CORRECT ANSWER proximity to customers, transportation, source
of labor, community attitude, proximity to suppliers, and many other factors.

The technique for determining location decisions.

Line Processes -CORRECT ANSWER A type of process used to produce a large
volume of a standardized product.

■ Limited customization and high volume

Batch Processes -CORRECT ANSWER A type of process used to produce a small
number of products in groups or batches based on customer orders or specifications.

■ High customization moderate volume

,Project Processes -CORRECT ANSWER A type of process used to make a one-at-a-
time product exactly to customer specifications.

■ Most custom and lowest volume

Continuous Processes -CORRECT ANSWER A type of process that operates
continually to produce a high volume of a fully standardized product.

- No customization and as high a volume as possible

Bottleneck -CORRECT ANSWER Longest task in the process.

Flexible Manufacturing System (FMS) -CORRECT ANSWER A type of automated
system that combines the flexibility of intermittent operations with the efficiency of
continuous operations.

Output/Input Control -CORRECT ANSWER A technique for monitoring the flow of jobs
between work centers.

Value-Added -CORRECT ANSWER The net increase created during the transformation
of inputs into final outputs.

Hybrid Layouts -CORRECT ANSWER Layouts that combine characteristics of process
and product layouts.

- Group technology layouts.
- Cell technology layouts.
- Grocery stores use hybrid layouts

Relationship Chart (REL) -CORRECT ANSWER Table that reflects opinions of
managers with regard to the importance of having any two departments close together.

Rectilinear Distance -CORRECT ANSWER The shortest distance between two
locations using north-south and east-west movements.

From-To Matrix -CORRECT ANSWER Table that gives the number of trips or units of
product moved between any pair of departments.

Block Plan -CORRECT ANSWER Schematic showing the placement of resources in a
facility.

Mean Observed Times -CORRECT ANSWER The average of the observation times for
each of the work elements.

Normal Time -CORRECT ANSWER The mean observed time multiplied by the
performance rating factor by the frequency of occurrence.

, Standard Time -CORRECT ANSWER The length of time it should take a qualified
worker using appropriate process and tools to complete a specific job, allowing time for
personal fatigue and unavoidable delays.

Just-in-Time (JIT) -CORRECT ANSWER A philosophy designed to achieve high-
volume production through elimination of waste and continuous improvement. Based on
a "pull" system rather than a "push" system. The three elements are just-in-time
manufacturing, total quality management, and respect for people.

Kanban card -CORRECT ANSWER A card that specifies the exact quantity of product
that needs to be produced.

Tier One Suppliers -CORRECT ANSWER Supplies materials or services directly to the
processing facility.

These are the suppliers that put products in specific containers or packages.

Internal Functions companies

Tier Two Suppliers -CORRECT ANSWER Directly supplies materials or services to a
tier-one supplier in the supply chain.

Suppliers of the specialty materials for the tier one suppliers to be able to produce the
packaging necessary for different products.

Think cardboard, plastic, glass, chemicals.

Tier Three Suppliers -CORRECT ANSWER Directly supplies materials or services to a
tier two supplier in the supply chain.

These are companies that extract raw materials.

Oil, raw chemical materials, wood.

Capacity Requirements Planning (CRP) -CORRECT ANSWER Determines the labor
and machine resources needed to fill the open and planned orders generated by the
MRP.

Basically, checking if there is enough work scheduled for operations

Enterprise Resource Planning (ERP) -CORRECT ANSWER Large software programs
used for planning and coordinating all resources throughout the entire enterprise.

Written for

Course

Document information

Uploaded on
November 2, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.89
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
studymasterstuvia
5.0
(1)

Also available in package deal

Get to know the seller

Seller avatar
studymasterstuvia Walden University
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
9 months
Number of followers
0
Documents
881
Last sold
2 months ago
Master Docs | Trusted Source for All Exams|Study Now

WELCOME TO STUDYMASTERS DOCUMENTS THIS IS PLACE FOR:  VERIFIED EXAMS QUESTIONS AND ANSWERS  ALL EXAMS  LATEST UPDATES  100% GUARANTEED PASS  POCKET FRIENDLY PRICES EXAMS AVAILABLE: • ALL ACLs EXAMS (ALL CHAPTERS) • ALL NURSING EXAMS (ALL CHAPTERS) • ALL CHEMISTRY EXAMS (GCSE, HESI, AP, AQA AND GRADE 10 CHEMISTRY) • ALL BIOLOGY EXAMS • ALL BUSINESS AND BUSINESS LAWS EXAMS • ALL PHYSICS EXAMS • ATI EXAMS • NGN EXAMS • ALL STUDY GUIDE MATERIALS • ALL TEST BANKS • WGU EXAMS • NUR EXAMS ✅ Why Students Choose My Docs: Verified answers and updated content Professionally formatted for quick review Guaranteed accuracy and clarity Affordable prices for premium quality 100% student satisfaction

Read more Read less
5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions