ANSWERS 2025-2026 EDITION!
Terms in this set (75)
What does the individual Marine Training logs (MCMAP Logbooks) are used to track the training
use to track their progress in and progress of each individual Marine.
MCMAP?
What is the course record used The course record that is used for reporting MCMAP training is NAVMC
to report MCMAP training? 11432.
After a mishap involving S-3 and the MACE
MCMAP, who are you required
to send the mishap report to?
How long must an MAI maintain All administrative materials must be retained for a period of three years.
administrative materials?
What are lesson plans, media, Curriculum Materials.
performance evaluation, and
concept cards classified as?
Which item is a detailed script for A lesson plan is the detailed script for the instructor, also
the referred to as an instructor outline.
instructor, also referred to as an
instructor outline?
True or False: Media is False. It is optional at belt advancement levels.
developed and required for all
user level training?
Which item is used to test the A performance evaluation checklist (PECL) is used to test
learning objectives for each learning objectives for each belt level.
belt level?
True or False: The MAI is True, a belt rank certificate is completed by the MAI for each
responsible for completing a individual Marine. The individual Marine is responsible for
certificate for every Marine entering a copy into their OMPF.
trained?
Where should the MAI go to find All MCMAP materials can be found on the MACE Website.
all
MCMAP materials?
, The mission of risk management is to identify and mitigate
What is the mission of risk
management? risk in all activities, both on and off duty.
True or False: Risk Assessment True. The MAI will use the baseline RAW from the MACE to
Worksheets (RAW) are needed produce RAW's specific to the unit.
for all MCMAP training?
Who is responsible for The MACE is responsible for developing the safety parameters
developing all safety for all approved martial arts training.
parameters of MCMAP?
1. Accept risk when the benefits outweigh the costs.
What are the four principles of 2. Accept no unnecessary risk.
Risk Management? 3. Anticipate and manage risk by planning.
4. Make risk decisions at the right level.
In-depth, deliberate, and time critical.
In-depth risk management is applied for a very detailed
What are the three levels of assessment using detailed research and formal testing.
Risk Management? Deliberate risk management is applied when there is time to
apply the full risk management process to the mission
planning. Time critical risk management is applied when there
is little to no time to make a plan, resulting in "on the spot"
mental and verbal review of the situation.
Which two categories must be Probability and severity.
determined when assessing
hazard?
Who is responsible for The MACE
developing the safety
parameters for all martial arts
training?
Who is the risk decision CO/OIC
authority for martial arts
training in a unit
What is the first step when Briefing the students.
conducting a belt ranking
achievement test?
When is remediation conducted After completion of the entire test
on techniques that were not
passed?
What must all Marines 90%