Fill in the blank: The largest distribution of software cost will be __________ in the program's life
cycle. - Answers Late
A software-costing model that bases cost estimates upon statistical data such as source lines
of code is an example of a ________costing model. - Answers - Parametric
An Analysis of Alternatives (AoA) is a study of the __________. - Answers - (Wrong) Potential
Acquistion Strategies for the Alternatives
As a general rule of thumb, __________ of the total ownership costs of a system occur late in the
life cycle, due to costs associated with operations and support. - Answers - (Wrong) 75-90%
- (Wrong) 55-65%
Joint Capability Technology Demonstrations (JCTDs) are a special case of Advanced
Technology Demonstrations (ATDs), enhanced so that they can demonstrate the potential to
eventually be fielded and used by operational forces. Additionally, JCTDs are: - Answers Used
for both maturing technology and refining operational concepts in the field
What is the total procurement cost of this system?
Cost Types Cost (in millions of dollars)
Research, Development, Test & Evaluation $400
Procurement of Prime Mission Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100 - Answers $1,000 Million
One cost estimation method can be used to estimate the cost of one component of a system,
while a different cost estimation method can be used to estimate the cost of another
component. - Answers True
Affordability is most concerned with: - Answers
When conducting a trade-off analysis of alternative concepts to provide needed warfighting
capabilities, which of the following system performance measurements must be met? -
Answers - Thresholds
This DoD Decision Support System uses four phases to develop the Department of Defense's