What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - correct answer $500 fine per day for each day of violation plus penalties for a misdemeanor. All Class A contractor licensure applications MUST include - correct answer information on the knowledge, skills, and abilities of the applicant. What is the PRIMARY purpose of licensing? - correct answer Protect the health and welfare of the public. When a claimant is paid funds from the Contractors Recovery Trust Fund - correct answer the contractor's license is revoked. !!! The application for licensure MUST include - correct answer the business address of the proposed designated employee. Which of the following is a requirement for a joint venture? - correct answer Either the joint venture or each contracting party of the joint venture must be licensed. All of the following must be licensed EXCEPT - correct answer a material supplier who advises a contractor. How much is the Class A initial license fee? - correct answer $200 A licensee's name change MUST be reported to the Board within a MAXIMUM of how many days? - correct answer 30 days According to the Board Rules and Regulations, a full-time employee is one who works a MINIMUM of how many hours per week? - correct answer 30 hours. A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net worth of - correct answer $15,000.

Meer zien Lees minder
Instelling
Naslca Virginia
Vak
Naslca Virginia

Voorbeeld van de inhoud

Naslca Virginia Exam Practice
What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of
license? - ✔✔ correct answer $500 fine per day for each day of violation plus penalties for a
misdemeanor.



All Class A contractor licensure applications MUST include - ✔✔ correct answer information on the
knowledge, skills, and abilities of the applicant.



What is the PRIMARY purpose of licensing? - ✔✔ correct answer Protect the health and welfare of
the public.



When a claimant is paid funds from the Contractors Recovery Trust Fund - ✔✔ correct answer the
contractor's license is revoked. !!!



The application for licensure MUST include - ✔✔ correct answer the business address of the
proposed designated employee.



Which of the following is a requirement for a joint venture? - ✔✔ correct answer Either the joint
venture or each contracting party of the joint venture must be licensed.



All of the following must be licensed EXCEPT - ✔✔ correct answer a material supplier who advises a
contractor.



How much is the Class A initial license fee? - ✔✔ correct answer $200



A licensee's name change MUST be reported to the Board within a MAXIMUM of how many days? -
✔✔ correct answer 30 days



According to the Board Rules and Regulations, a full-time employee is one who works a MINIMUM of
how many hours per week? - ✔✔ correct answer 30 hours.



A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net worth of - ✔✔
correct answer $15,000.



According to the Board Rules and Regulations, which of the following could be a qualified individual?
- ✔✔ correct answer Any full-time employee.

,Naslca Virginia Exam Practice

An appeal of the local building official's decision to refuse to grant a modification to the USBC MUST
be made to the local building board within a MAXIMUM of how many days? - ✔✔ correct answer 90
days.



A building official MUST issue a certificate of occupancy for a building that meets all the
requirements for a certificate within a MAXIMUM of how many working days after the certificate was
requested? - ✔✔ correct answer 5



Additions to buildings MUST comply with - ✔✔ correct answer the current code for new
construction.



When MUST the work be stopped following the issuance of a stop work order? - ✔✔ correct answer
Immediately



Who is to be in charge of a local building department? - ✔✔ correct answer Building official.



Contractors who are assessed a fee to support the Transaction Recovery Fund MUST pay this fee
within a MINIMUM of how many days from when the assessment fee notice was mailed? - ✔✔
correct answer 45 days



Contractors will be assessed a fee for the Transaction Recovery Fund whenever the fund balance is
less than - ✔✔ correct answer $400,000.



Payments made by the Transaction Recovery Fund to claimants may include an amount for - ✔✔
correct answer attorneys' fees.



A contract for which of the following types of structures may be subject to recovery from the
Transaction Recovery Fund? - ✔✔ correct answer Residential only.



A verified claim for payment from the Transaction Recovery Fund MUST occur within a MAXIMUM of
what period of time from the date the claimant was awarded a final judgment? - ✔✔ correct answer
12 months.



An appeal of a final decision of a county on an erosion control plan MUST be filed within a
MAXIMUM of how many days? - ✔✔ correct answer 30 days.

, Naslca Virginia Exam Practice

Temporary erosion and sediment control measures MUST be removed within a MAXIMUM of how
many days after the final site stabilization? - ✔✔ correct answer 30 days.



Which of the following statements about a sole proprietorship is TRUE? - ✔✔ correct answer The
business, or any part of it, can be sold, altered, or exchanged at will.



What type of business organization allows people to share financial resources? - ✔✔ correct answer
Partnership.



Which of the following estimating methods is typically used by the architect rather than the
contractor? - ✔✔ correct answer Conceptual estimate.



Equipment needs for a project are BEST estimated by - ✔✔ correct answer calculating the number of
hours or days it is needed.



What should be added to wage rates to ensure accuracy in estimating labor for a project? - ✔✔
correct answer Labor burden.



A reason for using a lower than usual profit markup for a specific project could be to - ✔✔ correct
answer cover company overhead costs.



Which of the following is a TRUE statement about estimating? - ✔✔ correct answer Both
overestimating and underestimating costs could have disastrous consequences.



A contractor should do all of the following when estimating a project EXCEPT - ✔✔ correct answer
assume ideal conditions



What MUST be included in an estimate for a job? - ✔✔ correct answer Materials, labor, equipment,
and overhead costs.



Costs that relate to construction activity but are NOT easily identifiable for a specific project are
considered - ✔✔ correct answer project overhead.

Geschreven voor

Instelling
Naslca Virginia
Vak
Naslca Virginia

Documentinformatie

Geüpload op
4 november 2025
Aantal pagina's
17
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
brittton phoenix
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
155
Lid sinds
2 jaar
Aantal volgers
95
Documenten
5174
Laatst verkocht
1 week geleden
BRITTTON PRESENTS YOU WITH QUALITY EXAM,TESTBANKS AND ASSIGNMENTS

providing high quality grades is my all time priority, welcome to the world of super grades All The Best!!!!

3.4

20 beoordelingen

5
7
4
3
3
5
2
1
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen