Prepare and pass your Michigan Builders License Exam with confidence using this verified and up-to-date study material. Includes real exam-style questions and correct answers based on the latest 2025 Michigan licensing standards. Covers all key exam topics including building codes, construction safety, project management, estimating, contracts, and Michigan-specific building regulations. Designed for builders, contractors, and construction professionals aiming to pass on the first try. Verified and graded A+ Updated for 2025 requirements Covers all exam sections and Michigan laws Ideal for state licensing preparation

Show more Read less
Institution
Course

Content preview

Michigan Builders License Exam Questions
and Answers Already Passed|2025
Created to serve as a complete, comprehensive code regulating the construction of
single-family, two-family and buildings consisting of three or more townhouse units. -
Answer IRC (International Residential Code)

Administrative - Answer First 2 chapters of code book are

True - Answer Plans or supporting documents are almost always required by the
controlling authority prior to issuing a permit. T or F

Yes - Answer Does the building official have the authority to render interpretations of
the code?

8 foot fence. - Answer None of the following require a permit, EXCEPT:
sidewalks and driveways
tiling
an 8 foot fence
playground equipment

False - Answer Tables and illustrations are always supported by information found in
the written code and footnotes. T or F

Live load. - Answer The amount of evenly distributed weight imposed by inhabitants,
goods and removable objects on a floor or roof system is referred to as

True. - Answer If a code requirement is in the book, it is both acceptable and
enforceable by the code official. T or F

Figures. - Answer Illustrations are typically referred to as

Determine that buildings are built to the minimum enforceable standard. - Answer
Generally speaking, the building official's job is to

True. - Answer It is required that all manufacturer instructions be at the jobsite at the
time of inspection. T or F

Kitchen. - Answer All of the following are not considered habitable spaces EXCEPT:
bathrooms
kitchens
storage spaces
closets

3. - Answer Bathrooms must be provided with an aggregate glazing area no less
than square feet, half of which must be openable.

44 inches. - Answer The maximum height of an egress window above the floor is

5.7 sq ft. - Answer A basement bedroom must have an egress window with a clear

,opening of at least square feet.

,3. - Answer At least one side-hinged exit door must be in each dwelling unit, and
must be feet wide.

30 inches. - Answer A porch more than inches above grade must be provided
with 36" guards.

200. - Answer Wall and ceiling finishes shall have a flame-spread classification of no
more than .

7 days. - Answer According to code, concrete must reach at least 70% of it's ability
within days.

40%. - Answer A stud used for a non-bearing partitions may not be notched more
than % of the stud width.

Additions, alterations, renovation and repairs. - Answer The Michigan Uniform
Energy code applies to new buildings as well as

U-factor. - Answer is a measure of how well the window or door
assembly conducts heat. The lower the number, the better insulation the assembly
will provide.

50%. - Answer Energy losses from recessed lighting fixtures can often reach %
of the total thermal loss of a ceiling.

R-3. - Answer Michigan requires a minimum thermal resistance of for
mechanical system piping.

True. - Answer Oversized HVAC equipment has a higher initial cost, a higher
operating cost, provides less comfort, and shorter life expectancy. T or F

Prescriptive Path. - Answer is the compliance route that applies Table
402.1.1 to building envelope components, and is considered the most simple.

Area weighted averages. - Answer can be used to satisfy U-factor and
SHGC requirements.

IC (Insulation Contact) - Answer Recessed lights must be rated.

True. - Answer Up to 15 square feet of glazing per dwelling unit is exempted from U-
value requirements. T or F

Registered design professional. - Answer The 2009 IECC requires a permanent
certificate posted on the electrical distribution panel. The certificate shall be
completed by the builder or

, State energy code requirements. - Answer One hurdle contractors face when bidding
for an energy efficient project is choosing materials that fit the design, and also meet

False. - Answer Historically significant buildings are not exempt from code changes.
T or F

R-value
Settled thickness
Manufacturer name - Answer Insulation products (blown and sprayed) must be
documented with:

March 2011. - Answer The new Michigan codes took effect in

10. - Answer Below grade walls are insulated from the top of the basement wall
down to below grade, or the basement floor, whichever is less.

Area weighted average. - Answer The is the combined Solar Heat Gain
Coefficient of all the glazed fenestration products in the building.

Thermal insulation R-values
Design criteria
Equipment systems - Answer Plans and specifications must be detailed in regards
to:

2009. - Answer In Michigan, the residential energy code is based on the
IECC, with certain amendments.

Air leakage. - Answer is the rate of air infiltration in the presence of a
specific pressure differential.

Windows
Attic access hatches
Recessed lights - Answer Air leakage is the random movement of air into and out of
through cracks and holes.

Table 402.1.1
2009 IECC - Answer R-values for insulation and fenestration requirements by
component can be found in

International Energy Conservation Code - Answer IECC

U-factor and UA alternatives. - Answer The compliance method
allows for more innovative construction techniques like SIPs or Advanced Framing.

500 sq feet - Answer R-30 is permitted in vaulted ceilings, but is limited to

True. - Answer Floor insulation must be installed to maintain permanent and
continuous contact with the underside of the subfloor decking. T or F

Written for

Course

Document information

Uploaded on
November 5, 2025
Number of pages
51
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
reginamarisol14

Get to know the seller

Seller avatar
reginamarisol14 University Of Central Florida
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
10 months
Number of followers
0
Documents
134
Last sold
-
HESI Nursing notes and questions pro

Welcome to my HESI study store ! I offer clear,high -quality notes and practise materials to help you pass your HESI nursing exams with confidence.My documents care plans ,pharmacology, NCLEX-style questions, and essential concepts made simple.Perfect for BSN and ADN students preparing for exams!

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions