Running head: Mamma’s Bakery and Sandwich Shoppe Project Charter 1




.




Team 3, “Zero Day”


Mama Mia’s Bakery IT Project


IFSM 438: Project Management


ITP-1




Keith Kittle Team Leader/Work Planning and Schedule

Carrie Murphy Assistant Team Leader

Paul Ingleton Configuration Manager/Assistant Documentation Manager

Nazia Hussain Editor/Assistant Research Manager

,Mamma’s Bakery and Sandwich Shoppe Project Charter 2


Executive Summary

The purpose of this project charter is to give a preliminary delineation of roles and
responsibilities, outlines the project objectives, identifies the main stakeholders, and
defines the authority of the project manager. It serves as a reference to the authority for
advancing the project to completion. The scope of the project is to provide Mamma
Mia’s Bakery and Sandwich Shoppe with Information Technology (IT) capabilities which
include: point-of-sale, inventory, and for bookkeeping purposes. Additionally, employees
at the bakery will use the system to connect to Mamma Mia’s suppliers, the health
department for food services, and other business relationships. Furthermore, the
system will have a website which connects to an Internet presence and so Mamma
Mia’s customers can make advance orders for pick-up. Additionally, the system will
have the capability to process debit and credit cards.

In considering all the requirements and task of this project, the estimate is $100,000.00
dollars. The schedule of this project will depend on the reconstruction and new
reconfiguration of the bakery. The plan is to install some hardware and wiring in the
closets and walls as the restructuring occurs in an effort for concealment for aesthetic
purposes. Estimate of the IT project is four weeks for total completion. The project
success criteria are to establish best practice communication methods with the
stakeholders to complete the project on time on budgets without scope creep while
providing what the customer needs for a 100 percent functional IT system without fatal
flaws.

The project management and technical approach are ensuring that the Project Team
completes the project on schedule, within budget, and within scope. The project
manager (PM) develops the Project Plan with the project team and manages the team’s
performance of tasks to complete all deliverables. The project objective is to automate
Mamma Mia’s Bakery and Sandwich Shop with an IT system to modernize the
organization for a simpler and more efficient operation. Some of the project constraints
are the budget and the time which the team must work within. Some of the most
obvious risks are the location of team members, as they are at various location around
the country and around the world. The entire team is not always available to meet at a
regularly scheduled time. So, it is frustrating getting critical information to key team
members at any given time. The most obvious risk is that some team members have
other project working on at the same time and must split available time between the
projects. Also, the client did not clearly present the project’s requirements and there is a
real risk of scope creep. Roles and responsibilities are: Team Leader/Project Manager,
Editor/Assistant Research Manager, Research Manager, Work Planning and
Schedule/Assistant Team Leader, Configuration Manager/Assistant Documentation
Manager, and Documentation Manager/Assistant Configuration Manager.

, Mamma’s Bakery and Sandwich Shoppe Project Charter 3


The primary stakeholders are Mamma Mia and her organization, the project team, and
the IT business which employee’s the project team. The PM will establish single points
of contact (SPOC) as the project communication methodology. Instead of everyone
communicating with everyone else, and enabling mass confusion, the stakeholders
communicate only with the SPOC. The project team members also communicate only
with the SPOC and the PM. This is an excellent way to simplify the communication
process. There is a consensus for change among the stakeholders. The threshold for is
that if there is a need for a change order which results in a 15 percent change of the
deliverables resulting in a three-week extension to the project completion time or
funding cost exceeding the project cost by 10 percent. The end of the project is the
complete satisfaction of all the major stakeholders.

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
23 januari 2021
Aantal pagina's
16
Geschreven in
2020/2021
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
4 jaar geleden

1.0

1 beoordelingen

5
0
4
0
3
0
2
0
1
1
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
StuviaGuides West Virgina University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
16217
Lid sinds
7 jaar
Aantal volgers
8363
Documenten
5980
Laatst verkocht
2 uur geleden
Accounting, Finance, Statistics, Computer Science, Nursing, Chemistry, Biology & More — A+ Test Banks, Study Guides & Solutions

As a Top 1st Seller on Stuvia and a nursing professional, my mission is to be your light in the dark during nursing school and beyond. I know how stressful exams and assignments can be, which is why I’ve created clear, reliable, and well-structured resources to help you succeed. I offer test banks, study guides, and solution manuals for all subjects — including specialized test banks and solution manuals for business books. My materials have already supported countless students in achieving higher grades, and I want them to be the guide that makes your academic journey easier too. I’m passionate, approachable, and always focused on quality — because I believe every student deserves the chance to excel.

Lees meer Lees minder
4.3

2295 beoordelingen

5
1571
4
305
3
184
2
74
1
161

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen