PAPER 2026 COMPLETE QUESTIONS AND
SOLUTIONS GRADED A+
⩥ The pre-hot work check must be conducted by the responsible person
before hot work is authorized and __________. Answer: least once per
day.
⩥ The check reports must be kept at the work site during the work, made
available for inspection by a representative of the FDNY, and maintained
on the premises for a minimum of. Answer: 48 hours after work is
complete.
⩥ A pre-hot work check must be conducted at least. Answer: once per
day
⩥ Hot work operations involving cutting or welding shall be conducted
at least. Answer: 35 feet from combustible materials and combustible
waste
⩥ All other hot work operations shall be conducted at least. Answer: 25
feet from combustible materials and combustible waste