The iterative process, which means repeating, is associated with:
a. systems thinking
b. the life cycle approach
c. the integrative process
d. the triple bottom line
e. impact categories - CORRECT ANSWER c. the integrative process
The integrative process should be started:
a. between the design and construction process
b. after the design process begins
c. before the design process begins
d. as soon as the project team is assembled regardless of what stage design is in
e. after the building is complete - CORRECT ANSWER c. before the design process begins
The purpose of systems thinking is to:
a. consider each part of a system in relation to only their positive effects on the larger whole
b. consider each part of a system as a single part unconnected to any other part in the system
c. consider each part of a system in relation to only the other parts of the system that it is
directly connected to
d. thinking about a system as a smaller part of a much greater whole
e. think about a system as many small parts that need to be considered individually as having no
connection to any other parts as a way to solve system problems - CORRECT ANSWER d. think
about a system as a smaller part of a much greater whole
The three phases of the integrative process include: (select three)
,a. recovery
b. discovery
c. development
d. implementation
e. occupancy - CORRECT ANSWER b. discovery
d. implementation
e. occupancy
Triple bottom line thinking is a three pronged approach that comprises decisions based on
(select three):
a. social factors
b. environmental factors
c. economic factors
d. stakeholder factors
e. shareholder factors - CORRECT ANSWER a. social factors
b. environmental factors
c. economic factors
The individual on the project team who is granted actual authority by the owner to register the
project and accept the certification agreement is called the:
a. agent
b. green rate
c project administrator
d. registrant
e. LEED provider - CORRECT ANSWER a. agent
Select the two terms that are incorrectly formatted per the USGBC trademark policy
, a. USGBC
b. US Green Building Council
c. LEED GA
d. U.S. Green Building Council
e. LEED Green Associate - CORRECT ANSWER b. US Green Building Council
c. LEED GA
The number of points assigned to each credit in the LEED rating systems is determined by the:
a. credit's ranking on the USGBC's list of seven impact categories
b. popularity of the credit with project teams
c. category it is in
d. number of times that type of credit appears in the rating system
e. impact on the usage of water - CORRECT ANSWER a. credit's ranking on the USGBC's list of
seven impact categories
The following two statements are true about prerequisites in the LEED rating systems: (select
two)
a. no pints are awarded for prerequisites
b. prerequisites are optional
c. project teams are not required to meet prerequisites if all other credits in the category are
met
d. three free points are awarded for each prerequisite
e. prerequisites are mandatory - CORRECT ANSWER a. no points are awarded for prerequisites
e. prerequisites are mandatory
The purpose of LEED reference guides is to provide: