The iterative process, which means repeating, is associated with: a. systems thinking b. the life cycle approach c. the integrative process d. the triple bottom line e. impact categories - CORRECT ANSWER c. the integrative process The integrative process should be started: a. between the design and construction process b. after the design process begins c. before the design process begins d. as soon as the project team is assembled regardless of what stage design is in e. after the building is complete - CORRECT ANSWER c. before the design process begins The purpose of systems thinking is to: a. consider each part of a system in relation to only their positive effects on the larger whole b. consider each part of a system as a single part unconnected to any other part in the system c. consider each part of a system in relation to only the other parts of the system that it is directly connected to d. thinking about a system as a smaller part of a much greater whole e. think about a system as many small parts that need to be considered individually as having no connection to any other parts as a way to solve system problems - CORRECT ANSWER d. think about a system as a smaller part of a much greater whole The three phases of the integrative process include: (select three) a. recovery b. discovery c. development d. implementation e. occupancy - CORRECT ANSWER b. discovery d. implementation e. occupancy Triple bottom line thinking is a three pronged approach that comprises decisions based on (select three): a. social factors b. environmental factors c. economic factors d. stakeholder factors e. shareholder factors - CORRECT ANSWER a. social factors b. environmental factors c. economic factors The individual on the project team who is granted actual authority by the owner to register the project and accept the certification agreement is called the: a. agent b. green rate c project administrator d. registrant e. LEED provider - CORRECT ANSWER a. agent Select the two terms that are incorrectly formatted per the USGBC trademark policy a. USGBC b. US Green Building Council c. LEED GA d. U.S. Green Building Council e. LEED Green Associate - CORRECT ANSWER b. US Green Building Council c. LEED GA The number of points assigned to each credit in the LEED rating systems is determined by the: a. credit's ranking on the USGBC's list of seven impact categories b. popularity of the credit with project teams c. category it is in d. number of times that type of credit appears in the rating system e. impact on the usage of water - CORRECT ANSWER a. credit's ranking on the USGBC's list of seven impact categories The following two statements are true about prerequisites in the LEED rating systems: (select two) a. no pints are awarded for prerequisites b. prerequisites are optional c. project teams are not required to meet prerequisites if all other credits in the category are met d. three free points are awarded for each prerequisite e. prerequisites are mandatory - CORRECT ANSWER a. no points are awarded for prerequisites e. prerequisites are mandatory The purpose of LEED reference guides is to provide: a. detailed guidance to LEED project teams on how to design and build their LEED registered project to meet the certification requirements of the credits they are seeking b. project teams with references of professional who can be contacted to provide expertise and guidance on LEED projects c. detailed lists of certified LEED projects that project teams can reference when designing and building their projects d. owners with a detailed list of LEED APs who would be available to design and build their projects e. menus of costs related to each credit for project teams to use when deciding which credits and certification levels to select - CORRECT ANSWER a. detailed guidance to LEED project teams on how to design and build their LEED registered project to meet the certificaiton requirements of the credits they are seeking A measurement of how far a pedestrian and bicyclist would travel from a point of origin to a destination, reflecting access to amenities, safety, convenience, and obstruction to movement is called a. integrative travel analysis b. shortest path analysis c. continuous line mapping d. destination mapping e. simple straight line radius - CORRECT ANSWER b. shortest path analysis In the Location and Transportation category, projects fulfilling the first credit, LEED for Neighborhood Development Location: a. are required to fulfill all the other credits in the category b. automatically get certified as LEED Neighborhood Developments c. are not eligible to earn other credits in the category d. get a reduced rate on their LEED certification e. are required to have one LEED AP on their project team - CORRECT ANSWER c. are not eligible to earn other credits in the cateogry A brownfield site: (select two) a. is a site that does not receive enough rain and sunlight and therefore has mostly brown or no grass b. is a site requiring remediation to make it safe enough for occupancy c. is a foreclosed site put up for auction by the government d. is a site that is priced at a premium due to the fact that petroleum has been found on the site within the last ten years e. usually has government subsidies available for its purchase and remediation - CORRECT ANSWER b. is a site requiring remediation to make it safe enough for occupancy e. usually has government subsidies available for its purchase and remediation The purpose of a density calculation is to: a. calculate the density of the soil during brownfield remediation b. determine how many people will be carpooling to work versus riding in their own vehicles c. determine transportation routes to and from a certain location at peak travel times d. figure out the difference between gross site area versus project boundary perimeter when determining the LEED project boundary e. determine the square footage of building per acre of land - CORRECT ANSWER e. determine the square footage of buildings per acre of land Select three of the following that are listed as sensitive sites in the Location and Transportation (LT) category that should not be built on: a. wetlands b. previously developed farmland c. prime farmland d. brownfields e. floodplains - CORRECT ANSWER a. wetlands c. prime farmland e. floodplains Select two of the following that are strategies to reduce light trespass: a. install uplighting in parking lots to reduce the spillage of light across the project boundary b. schedule cleanin

Show more Read less
Institution
Top Academic Papers
Course
Top Academic Papers

Content preview

LEED GA Exam Practice Questions And
Quality Answers |100% Verified | 2026/27
The iterative process, which means repeating, is associated with:

a. systems thinking

b. the life cycle approach

c. the integrative process

d. the triple bottom line

e. impact categories - CORRECT ANSWER c. the integrative process



The integrative process should be started:

a. between the design and construction process

b. after the design process begins

c. before the design process begins

d. as soon as the project team is assembled regardless of what stage design is in

e. after the building is complete - CORRECT ANSWER c. before the design process begins



The purpose of systems thinking is to:

a. consider each part of a system in relation to only their positive effects on the larger whole

b. consider each part of a system as a single part unconnected to any other part in the system

c. consider each part of a system in relation to only the other parts of the system that it is
directly connected to

d. thinking about a system as a smaller part of a much greater whole

e. think about a system as many small parts that need to be considered individually as having no
connection to any other parts as a way to solve system problems - CORRECT ANSWER d. think
about a system as a smaller part of a much greater whole



The three phases of the integrative process include: (select three)

,a. recovery

b. discovery

c. development

d. implementation

e. occupancy - CORRECT ANSWER b. discovery

d. implementation

e. occupancy



Triple bottom line thinking is a three pronged approach that comprises decisions based on
(select three):

a. social factors

b. environmental factors

c. economic factors

d. stakeholder factors

e. shareholder factors - CORRECT ANSWER a. social factors

b. environmental factors

c. economic factors



The individual on the project team who is granted actual authority by the owner to register the
project and accept the certification agreement is called the:

a. agent

b. green rate

c project administrator

d. registrant

e. LEED provider - CORRECT ANSWER a. agent



Select the two terms that are incorrectly formatted per the USGBC trademark policy

, a. USGBC

b. US Green Building Council

c. LEED GA

d. U.S. Green Building Council

e. LEED Green Associate - CORRECT ANSWER b. US Green Building Council

c. LEED GA



The number of points assigned to each credit in the LEED rating systems is determined by the:

a. credit's ranking on the USGBC's list of seven impact categories

b. popularity of the credit with project teams

c. category it is in

d. number of times that type of credit appears in the rating system

e. impact on the usage of water - CORRECT ANSWER a. credit's ranking on the USGBC's list of
seven impact categories



The following two statements are true about prerequisites in the LEED rating systems: (select
two)

a. no pints are awarded for prerequisites

b. prerequisites are optional

c. project teams are not required to meet prerequisites if all other credits in the category are
met

d. three free points are awarded for each prerequisite

e. prerequisites are mandatory - CORRECT ANSWER a. no points are awarded for prerequisites

e. prerequisites are mandatory



The purpose of LEED reference guides is to provide:

Written for

Institution
Top Academic Papers
Course
Top Academic Papers

Document information

Uploaded on
November 7, 2025
Number of pages
16
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lydiah247 West Virgina University
Follow You need to be logged in order to follow users or courses
Sold
33
Member since
2 year
Number of followers
10
Documents
2867
Last sold
1 month ago
SHINE

Welcome to my page- you are able to get revision questions,Summary notes and Exams that help you pass .

2.2

5 reviews

5
1
4
0
3
1
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions