OM TEST 3 EXAM QUESTIONS AND ANSWERS Kanban means "symbol" or "box" in Japanese. - CORRECT ANSWERFalse You have been called in as a consultant to set up a kanban control system. The first thing you do is to determine the number of kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 1,200 per hour. You estimate the safety stock should be set at 5 percent of the demand during lead time. The tote trays used as containers can hold 2 units of stock, and the lead time to replenish an order is 10 hours. Which of the following is the number of kanban card sets necessary to support this situation? - CORRECT ANSWER6,300 k= 1,200 x 10 x 1.05/2= 6,300

Meer zien Lees minder
Instelling
OM
Vak
OM

Voorbeeld van de inhoud

OM TEST 3 EXAM QUESTIONS AND ANSWERS
Kanban means "symbol" or "box" in Japanese. - CORRECT ANSWER✅✅False



You have been called in as a consultant to set up a kanban control system. The first thing you do is to
determine the number of kanban card sets needed. Your research shows that the expected demand
during lead time for a particular component is 1,200 per hour. You estimate the safety stock should be
set at 5 percent of the demand during lead time. The tote trays used as containers can hold 2 units of
stock, and the lead time to replenish an order is 10 hours. Which of the following is the number of
kanban card sets necessary to support this situation? - CORRECT ANSWER✅✅6,300

k= 1,200 x 10 x 1.05/2= 6,300



When implementing a lean production system, a stabilized schedule is achieved using which of the
following? - CORRECT ANSWER✅✅Level scheduling



Lean production makes implementing green strategies in manufacturing processes more difficult. -
CORRECT ANSWER✅✅False



JIT manufacturing forces a firm to work with a lower water level despite safety hazards. - CORRECT
ANSWER✅✅False



In setting up a kanban control system you need to determine the number of kanban card sets needed. If
the expected demand during lead time is 25 per hour, the safety stock is 20 percent of the demand
during lead time, the container size is 5, and the lead time to replenish an order is 5 hours, what the
number of kanban card sets is needed? - CORRECT ANSWER✅✅30

k= 25 x 5 x 1.20/5= 30



JIT is typically applied to nonrepetitive manufacturing. - CORRECT ANSWER✅✅False



Group technology (GT) is credited with which of the following benefits? - CORRECT
ANSWER✅✅Reducing waiting time between process operations

,A principle of value stream mapping is to concentrate on speeding up value-added operations. -
CORRECT ANSWER✅✅False



Which of the following is an element that addresses elimination of waste under lean production? -
CORRECT ANSWER✅✅Kanban production control system



To implement a flow process in developing a lean system a firm might do which of the following? -
CORRECT ANSWER✅✅Reduce setup/changeover time



Lean production is an integrated set of activities designed to achieve high-volume production using
minimal inventories of raw materials, work-in-process, and finished goods. - CORRECT ANSWER✅✅True



Which of the following is not listed in the textbook as a component of a lean supply chain? - CORRECT
ANSWER✅✅Lean management



One of the many lean techniques that have been successfully applied in service firms is the eliminating
of unnecessary activities. - CORRECT ANSWER✅✅True



A kaizen burst is a symbol on a value stream map. - CORRECT ANSWER✅✅True



An activity where the parts that go into each unit of a product are periodically removed from inventory
and accounted for based on the number of units produced is called which of the following? - CORRECT
ANSWER✅✅Backflush



In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated? -
CORRECT ANSWER✅✅Overproduction



Automation is a key to lean procurement. - CORRECT ANSWER✅✅True



The goal of JIT production is to drive all inventory queues lower. - CORRECT ANSWER✅✅False

, Applying lean concepts to logistics is difficult unless either the manufacturer or the customer owns the
logistics activities. - CORRECT ANSWER✅✅False



Group technology is a philosophy wherein similar parts are grouped together and the processes
required to make the parts are arranged as a work cell. - CORRECT ANSWER✅✅True



One of the many lean techniques that have been successfully applied in service firms is the upgrading of
quality. - CORRECT ANSWER✅✅True



Uniform planet loading is a process of smoothing the production activity flow to dampen the reaction
waves that normally occur in response to schedule variations. - CORRECT ANSWER✅✅True



Uniform planet loading is where you schedule production with different amounts of the same product
each day of the week to permit variation to meet changing demand requirements. - CORRECT
ANSWER✅✅False



Lean production is a management philosophy and a pull system throughout the plant. - CORRECT
ANSWER✅✅True



Which of the following address elimination of waste under lean production? - CORRECT
ANSWER✅✅Quality at the source



In setting up a Kanban control system you need to determine the number of Kanban card sets needed. If
assume the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the
demand during lead time, the container size is 4, and the lead time to replenish an order is 8 hours,
what number of Kanban card sets is needed? - CORRECT ANSWER✅✅120

k= 50 x 8 x 1.20/4= 120



In the textbook, Toyota's Fujio Cho identified which of the following types of waste to be eliminated? -
CORRECT ANSWER✅✅Product defects



In implementing a lean production system you should work with suppliers to do which of the following?
- CORRECT ANSWER✅✅Make frequent deliveries

Geschreven voor

Instelling
OM
Vak
OM

Documentinformatie

Geüpload op
8 november 2025
Aantal pagina's
17
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
STANGRADES Stanford University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
85
Lid sinds
1 jaar
Aantal volgers
1
Documenten
11673
Laatst verkocht
13 uur geleden
STAN-GRADES

EXCELLENCY IN ACADEMIC MATERIALS

3.4

14 beoordelingen

5
6
4
1
3
3
2
1
1
3

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen