CONSTRUCTION LATEST EXAM 2025
ORGANIZED QUESTIONS ,STEP BY STEP
EXPALANATIONS AND REVIEW GUIDE
ALREADY GRADED A+ AND 100%
GUARANTEE PASS (BRAND NEW!!!!!!)
bridge length - THE CORRECT ANSWER-The overall length measured
along the line of survey stationing from back to back of
backwalls of abutments, if present, otherwise end to end of the
bridge floor; but, in no case less than the total clear opening of
the structure
bridge width - THE CORRECT ANSWER-The clear width measured at
right angles to the longitudinal centerline of the bridge between
the bottom of curbs, or in the case of multiple height of curbs,
between the bottoms of the lower risers or, if curbs are not
used, between inner faces of parapet or railing
Change Order. - THE CORRECT ANSWER-A written order issued by the
Department to the Contractor after execution of the Contract
authorizing one or more of the following: 1. Changes in the
Work. 2. Modifications in the basis of payment. 3.
Modifications to Contract Time.
, Commercially Useful Function - THE CORRECT ANSWER-Occurrences
in which the subcontractor is responsible for the execution of a
distinct element of the work of a contract and carrying out its
responsibilities by actually performing, managing, and
supervising the work involved, and with respect to materials
and supplies used on the contract, prepares the estimate,
negotiates price, determines quality and quantity, orders the
material, arranges delivery, installs (where applicable), and
pays for the material and supplies itself for the project.
Completion - THE CORRECT ANSWER-When all of the following have
occurred: 1. The Work has been satisfactorily completed in all
respects according to the Contract. 2. The Project is ready for
use by the Department as required by the Contract. 3. The
Contractor has satisfactorily executed and delivered to the RE
all documents, certificates, and proofs of compliance required
by the Contract including the Notice of Completion.
construction operations - THE CORRECT ANSWER-Physical work done
in the performance of the Contract within the Project Limits.
Does not include off-site mobilization, procurement and off-site
storage of materials and plants, engineering, performance bond
and payment bond, surveys, working drawings, off-site field
offices, schedules, certificates, forms, or documents
Contract - THE CORRECT ANSWER-The written integrated agreement
between the Department and the Contractor setting forth the
obligations of the parties, including, but not limited to, the
performance of the Work and the basis of payment. It includes
the advertisement, Proposal, Certification as to Publication and
Notice of Advertisement for Proposal, bid, Appointment of
Agent by Nonresident Contractors, Resolution of Award of
Contract, Executed Form of Contract, performance and