Bowline |- |CORRECT |ANSWER✔✔-secure |safety |line
Back |Hitch |- |CORRECT |ANSWER✔✔-secure |rope |scaffold
Working |Hitch |- |CORRECT |ANSWER✔✔-back |up |to |back |hitch
Overnight |Hitch |- |CORRECT |ANSWER✔✔-tie |off |scaffold |at |night
Becket |Hitch |- |CORRECT |ANSWER✔✔-tie |rope |to |block |and |tackle
Rig |3-Part |Block |- |CORRECT |ANSWER✔✔-used |to |hoist |rope |scaffold
Timber |Hitch |- |CORRECT |ANSWER✔✔-used |to |hoist |planks, |cross |braces, |etc.
Clove |Hitch |- |CORRECT |ANSWER✔✔-multipurpose |knot
Square |Knot |- |CORRECT |ANSWER✔✔-tie |two |ropes |together |of |same |diameter
Sheet |Bend |- |CORRECT |ANSWER✔✔-tie |two |ropes |together |of |different |diameter
k |Sheep |- |CORRECT |ANSWER✔✔-
, Cats |Paw |- |CORRECT |ANSWER✔✔-Bowline |loop |with |3 |twists |for |hoisting |a |hook
Rolling |Hitch |- |CORRECT |ANSWER✔✔-Tensionless |knot |used |for |strain |relief |etc.
Rope |scaffolds |must |use |Grade |(blank) |Manila |rope |- |CORRECT |ANSWER✔✔-#1
Right |regular |laid |ropes |should |be |coiled |(Blank) |- |CORRECT |ANSWER✔✔-clockwise
Rope |scaffolding |must |use |()" |diameter |rope |for |manila |rope |- |CORRECT |ANSWER✔✔-3/4"
rope |scaffolding |cannot |be |used |higher |than |() |- |CORRECT |ANSWER✔✔-100'
rope |scaffolds |must |be |able |to |be |() |to |a |roof |or |setback |- |CORRECT |ANSWER✔✔-lowered
suspension |lines |may |never |be |() |- |CORRECT |ANSWER✔✔-spliced
pull |lines |on |rope |scaffold |must |be |closest |to |a(). |• |B() |of |the |stirrup |from |the |worker, |as |best |
practice. |- |CORRECT |ANSWER✔✔-A(building |wall) |B(opposite |side)
wire |ropes |must |support |() |times |the |intended |load |- |CORRECT |ANSWER✔✔-6 |times
Wire |ropes |must |not |be |() |they |must |hang |free |- |CORRECT |ANSWER✔✔-coiled |up
All |cable |terminations |must |have |a |(). |- |CORRECT |ANSWER✔✔-thimble |and |three |j-clips.
Answers
Bowline |- |CORRECT |ANSWER✔✔-secure |safety |line
Back |Hitch |- |CORRECT |ANSWER✔✔-secure |rope |scaffold
Working |Hitch |- |CORRECT |ANSWER✔✔-back |up |to |back |hitch
Overnight |Hitch |- |CORRECT |ANSWER✔✔-tie |off |scaffold |at |night
Becket |Hitch |- |CORRECT |ANSWER✔✔-tie |rope |to |block |and |tackle
Rig |3-Part |Block |- |CORRECT |ANSWER✔✔-used |to |hoist |rope |scaffold
Timber |Hitch |- |CORRECT |ANSWER✔✔-used |to |hoist |planks, |cross |braces, |etc.
Clove |Hitch |- |CORRECT |ANSWER✔✔-multipurpose |knot
Square |Knot |- |CORRECT |ANSWER✔✔-tie |two |ropes |together |of |same |diameter
Sheet |Bend |- |CORRECT |ANSWER✔✔-tie |two |ropes |together |of |different |diameter
k |Sheep |- |CORRECT |ANSWER✔✔-
, Cats |Paw |- |CORRECT |ANSWER✔✔-Bowline |loop |with |3 |twists |for |hoisting |a |hook
Rolling |Hitch |- |CORRECT |ANSWER✔✔-Tensionless |knot |used |for |strain |relief |etc.
Rope |scaffolds |must |use |Grade |(blank) |Manila |rope |- |CORRECT |ANSWER✔✔-#1
Right |regular |laid |ropes |should |be |coiled |(Blank) |- |CORRECT |ANSWER✔✔-clockwise
Rope |scaffolding |must |use |()" |diameter |rope |for |manila |rope |- |CORRECT |ANSWER✔✔-3/4"
rope |scaffolding |cannot |be |used |higher |than |() |- |CORRECT |ANSWER✔✔-100'
rope |scaffolds |must |be |able |to |be |() |to |a |roof |or |setback |- |CORRECT |ANSWER✔✔-lowered
suspension |lines |may |never |be |() |- |CORRECT |ANSWER✔✔-spliced
pull |lines |on |rope |scaffold |must |be |closest |to |a(). |• |B() |of |the |stirrup |from |the |worker, |as |best |
practice. |- |CORRECT |ANSWER✔✔-A(building |wall) |B(opposite |side)
wire |ropes |must |support |() |times |the |intended |load |- |CORRECT |ANSWER✔✔-6 |times
Wire |ropes |must |not |be |() |they |must |hang |free |- |CORRECT |ANSWER✔✔-coiled |up
All |cable |terminations |must |have |a |(). |- |CORRECT |ANSWER✔✔-thimble |and |three |j-clips.