Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

AWWA Backflow Prevention Assembly Testing: Key Procedures and Troubleshooting Exam 2026 Questions and Answers

Beoordeling
-
Verkocht
-
Pagina's
25
Cijfer
A+
Geüpload op
10-11-2025
Geschreven in
2025/2026

AWWA Backflow Prevention Assembly Testing: Key Procedures and Troubleshooting Exam 2026 Questions and Answers

Instelling
Virginia Commercial Pesticide Applicators CORE
Vak
Virginia Commercial Pesticide Applicators CORE

Voorbeeld van de inhoud

AWWA Backflow Prevention Assembly
Testing: Key Procedures and
Troubleshooting Exam 2026 Questions
and Answers

When testing a reduced pressure principle backflow prevention assembly, there is

intermittent spitting from the relief valve. What is the possible cause of the

spitting? - Correct answer-supply pressure fluctuations

When testing the air inlet of a pressure vacuum breaker the hose(s) on the test kit

shall be connected in this manner: - Correct answer-High side hose to the #2

testcock

When testing the #1 check valve of a double check valve assembly you have

opened the #3 testcock to the atmosphere. The water recedes from the sight tube.

How do you proceed? - Correct answer-Lower the test kit to the centerline of the

assembly; record the reading as the static pressure drop across the #1 check valve.

Note that the #2 check valve and the #2 shut off valve are leaking and terminate the

test.

©COPYRIGHT 2025, ALL RIGHTS RESERVED 1

,As you move water from the high side of the #1 check valve to the low side of the

#2 check valve of a reduced pressure principle backflow prevention assembly, the

indicator on the test kit falls to the low end of the scale and the differential pressure

relief valve discharges a continuous stream of water. How do you proceed? -

Correct answer-Open the low side bleed needle valve to re-establish differential

pressure above the apparent differential pressure to give the #2 check a second

chance.

When testing a double check valve assembly and the #1 check valve fails you may

proceed in the following manner: - Correct answer-Fail the #1 check valve and

continue to test the #2 check valve

The correct procedure to test the #1 check valve of a double check valve assembly

is to: - Correct answer-Install the bleed arrangement on the #2 testcock before

purging air from the test kit

As you start to test the air inlet on a pressure vacuum breaker you close the #2 shut

off valve, raise your test kit to the appropriate elevation and close the #1 shut off

valve. You open the high side bleed needle valve one quarter turn. Water continues

to discharge from the high side bleed needle valve and the indicator on your test kit

remains at the high side of the scale. How do you proceed? - Correct answer-Open

the #1 testcock to compensate for a leaking #1 shut off valve.

©COPYRIGHT 2025, ALL RIGHTS RESERVED 2

, Regarding question #4, after you have opened the low side bleed needle valve and

re-established the differential pressure above the apparent differential pressure, you

close the low side bleed needle valve. Now you test kit indicates an acceptable

value for the actual differential pressure across the #1 check valve. How do you

proceed? - Correct answer-Accept the value as the actual differential pressure

across the #1 check valve

When testing the #2 check valve of a double check valve assembly you open the #4

testcock. Water continues to discharge from the sight tube and the bleed valve

arrangement, after you have opened the bleed valve arrangement completely on the

#3 testcock. How do you proceed? - Correct answer-Close the bleed valve

arrangement and open the #2 testcock to compensate for a leaking #1 shut off valve

When testing the #2 check valve of a double check valve assembly you open the #4

testcock. The water in the sight tube recedes. How do you proceed? - Correct

answer-Lower the test kit to the centerline of the assembly and record the reading

on the test kit noting the #2 shut off valve is leaking with demand.

When testing the #1 check valve of a double check valve assembly it is necessary

to use the bleed valve arrangement to compensate for a leaking #1 shut off valve.

The static pressure drop across the #1 check valve as indicated by the test kit is 0.6




©COPYRIGHT 2025, ALL RIGHTS RESERVED 3

Geschreven voor

Instelling
Virginia Commercial Pesticide Applicators CORE
Vak
Virginia Commercial Pesticide Applicators CORE

Documentinformatie

Geüpload op
10 november 2025
Aantal pagina's
25
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.59
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EmillyCharlotte Howard Community College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
131
Lid sinds
1 jaar
Aantal volgers
5
Documenten
12293
Laatst verkocht
18 uur geleden
ALL-MAJOR.

On this page, you find all documents, package deals, and flashcards offered by seller Emilly Charlotte.

3.5

29 beoordelingen

5
9
4
10
3
2
2
3
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen