Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

WGU - C722 Exam wit verified detailed solutions

Rating
-
Sold
-
Pages
40
Grade
A+
Uploaded on
11-11-2025
Written in
2025/2026

WGU - C722 Exam wit verified detailed solutions

Institution
C722
Course
C722

Content preview

WGU - C722 Exam wit verified detailed solutions ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Three essential drivers that must be achieved to generate positive characteristics in project
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




teams - correct answer✔✔Cohesiveness, Trust, Motivation
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




The five stages Dr. Bruce Tuckman (1965) introduced of group development - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔Forming, Storming, Norming, Performing, Adjorning ||\\//|| ||\\//|| ||\\//|| ||\\//||




Forming - correct answer✔✔In this stage, team members may be meeting for the first time. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Often, no one really knows much about anyone else on the team. It may be premature to
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




refer to this group of individuals as a team. It is a time of introduction and forming
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




relationships and understanding from exchange of information. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Storming - correct answer✔✔Team members are beginning to know about each other, but ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




they do not yet understand how to work together. Members may "jockey for position" within
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




the team. The dynamics of working together beyond any written statement of "roles and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




responsibilities" are being established. Personalities surface, showing the strengths, ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




weaknesses, and personal needs of each individual on the team. Integration into a team ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




may come with some struggle and conflict.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Norming - correct answer✔✔Team members have "figured out" how they will interact with ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




each other. Working relationships are beginning to form. Trust and understanding is
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




beginning to form between team members. They are beginning to feel comfortable working ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




together and openly and willingly sharing information. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Performing - correct answer✔✔Team members are fully comfortable working together. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Trust has been developed. Working relationships have jelled. Work is being conducted and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




project progress is occurring. ||\\//|| ||\\//|| ||\\//||

,Adjourning - correct answer✔✔This only occurs when all the team's work has been ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




completed and the team is no longer required. This may occur at any time in the project life ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




cycle.
||\\//||




Co-located Teams - correct answer✔✔involves team members physically working at the ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




same location or holding project meetings together in a common setup.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Virtual Teams - correct answer✔✔are teams whose members interact primarily through ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




electronic communications. Members of a virtual team may be within the same building or ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




across continents. ||\\//||




Two common situations occur that may prompt a change to the baseline scope - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔The scope may be expanded to include additional functionality or the scope may ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




be diminished due to changes in the project environment such as reduced funding or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




requirements or changing time/due date. ||\\//|| ||\\//|| ||\\//|| ||\\//||




Scope creep - correct answer✔✔occurs when the project team integrates enhancements to
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




the scope without proper evaluation and approval.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




work performance data - correct answer✔✔will identify the work activities that are
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




completed, partially completed, or not started. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




risk register - correct answer✔✔is a list of potential risks, how the risks will be monitored,
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




and what action will be taken should the risk event occur.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




corrective action - correct answer✔✔is a document issued to identify quality failures and ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




how they will be corrected. The deliverable itself may need to be reworked and the project
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




plan may need to be revised to ensure that future deliverables do not include the same
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




error.

,The Four Categories of Change - correct answer✔✔Contingency plans, improvement
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




changes, external events, scope change ||\\//|| ||\\//|| ||\\//|| ||\\//||




The change management system - correct answer✔✔is in place to formally identify,
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




evaluate, decide, and communicate project changes.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Recording - correct answer✔✔is the process of documenting and archiving project-related
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




information.



Reporting - correct answer✔✔is a key nonverbal communications methodology used to
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




inform and to document project information.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Weekly status reports that are often working documents for the team to communicate: -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




correct answer✔✔Accomplishments, Issues, Schedules, Resource utilization
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Monthly status reports for senior stakeholders that would include: - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




answer✔✔Project overview bragging about progress, Issues including red light (critical) ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




problems needing immediate resolution, yellow light items that are warning flags, and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




resolved issues, Current accomplishments, Future plans for the next month, Resource
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




utilization and plans ||\\//|| ||\\//||




Monthly Financial Report - correct answer✔✔showing progress against the budget
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




quantifying monies spent and planned to be spent and identifying issues with ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




recommendations for resolution ||\\//|| ||\\//||




Change management reporting - correct answer✔✔showing changes identified, requiring
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




approval, and resolution. ||\\//|| ||\\//||

, Project controls - correct answer✔✔are the data gathering, management, and analytical
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




processes used to predict, understand, and constructively influence the time and cost
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




outcomes of a project or program. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Three Aspects of Project Quality - correct answer✔✔quality management, quality
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




assurance, and quality control. ||\\//|| ||\\//|| ||\\//||




Quality management - correct answer✔✔is the process of identifying the customer's
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




requirements and how they will be measured. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Quality assurance - correct answer✔✔is the process of validating that the requirements and
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




measurements are appropriate for the project environment.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Quality control - correct answer✔✔is the process of monitoring and changing project
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




execution to ensure that activities are being executed as planned and will result in meeting
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




the customer requirements. It is the monitoring and controlling process that occurs during
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




project execution. ||\\//||




Standards - correct answer✔✔are requirements that are generally accepted by a group of
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




firms that produce similar products or services.
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




Requirements - correct answer✔✔are what the customer needs to achieve from the ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




completed project. ||\\//||




Quality audits - correct answer✔✔are rigorous reviews of the project performance. These
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




reviews are often completed by groups of experts outside of the project team such as a
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




company's quality assurance (QA) department or an outside consultant. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




positive outcomes of the audit - correct answer✔✔Identifying issues before we go into
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||




production

Written for

Institution
C722
Course
C722

Document information

Uploaded on
November 11, 2025
Number of pages
40
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$22.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ruiz Liberty University
Follow You need to be logged in order to follow users or courses
Sold
96
Member since
1 year
Number of followers
1
Documents
13884
Last sold
2 weeks ago
Top-Quality Study Materials for Success – Ace Your Exams with Expert Resources!

Access high-quality study materials to help you excel in your exams. Get notes, summaries, and guides tailored to your courses!

3.2

15 reviews

5
4
4
4
3
2
2
1
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions