Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Project Management Plan Template (Pre-Project PDF) & Guide

Beoordeling
-
Verkocht
-
Pagina's
126
Cijfer
A
Geüpload op
11-11-2025
Geschreven in
2025/2026

Download our comprehensive Project Management Pre-Project Plan template. This PDF guide includes key sections like scope definition, deliverables, timelines, risk assessment, and stakeholder analysis to successfully initiate your project.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

1|Page



WGU C722 Project Management Pre-assessment
Actual Exam – Complete 70 Questions and Correct
Verified Answers/ C722 Pre-assessment Test


A project was authorized as an operational necessity to
repair a design flaw in the date field on a computer
system that constrains the year number to two digits
instead of permitting the year to be indicated with four
digits. During execution of the activity concerned with
identifying the affected software, five relevant software
modules were discovered that had not been included in
the scope baseline. The project team must adjust the
baselines to include the omitted scope.


Which change management phase does this scenario
describe?


a) Preparing for the change
b) Managing the change
c) Reinforcing the change
d) Upgrading the change - ...ANSWER...✓✓ a) Preparing
for the change

,2|Page



A general contractor is managing a highway construction
project that will repair a flood-damaged road. The
Department of Transportation offered an incentive fee if
the repairs are completed early. Therefore, the project
manager has established a rewards and recognition
program and has communicated this program to the
project team member. The project's recognition program
will reward project team members who add value by
accelerating the project while maintaining its ability to
deliver the completed scope correctly.


Which change management phase does this scenario
describe?


a) Preparing for the change
b) Managing the change
c) Reinforcing the change
d) Upgrading the change - ...ANSWER...✓✓ c) Reinforcing
the change


A general contractor is managing a construction project
that will add a new conference room to an existing office
building. The project was documented in a fixed-price
contract that specified a completion date. The contract

,3|Page



includes a damages clause imposing a late completion
penalty if the conference room is not ready for use by the
due date. One month into the implementation, the
customer wants to modify the room's lighting equipment.
The requested change will delay the project's critical path
by three months.


Which process should be used to maintain the existing
baseline?


a) Using a change management system to influence
performance
b) Absorbing the change request in the baselines for time
and cost
c) Focusing on the original scope
d) Using the risk management system to process change
requests - ...ANSWER...✓✓ a) Using a change
management system to influence performance


A general contractor from Germany is managing a
construction project in Norway that will add a new
conference room to an existing office building. The project
needs to collect requirements from the client prior to
developing plans to build the new conference room.

, 4|Page




Which two actions would prove useful to plan the
project's quality?


a) Defining traceable and verifiable requirements that can
be validated at project closure
b) Establishing metrics that describe what to measure
and how to measure it
c) Using inventory to protect against defects during
project implementation
d) Changing the work plan to account for the project
experiencing common variation
e) Using slogans and numerical quotas to exhort
resources to work harder - ...ANSWER...✓✓ a & b


a) Defining traceable and verifiable requirements that can
be validated at project closure
b) Establishing metrics that describe what to measure
and how to measure it


What is the name for the closing task where all project
activities are reviewed to determine what went right and
what went wrong?

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
11 november 2025
Aantal pagina's
126
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$31.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
ASCORES

Maak kennis met de verkoper

Seller avatar
ASCORES Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
6 maanden
Aantal volgers
1
Documenten
1497
Laatst verkocht
5 maanden geleden
A-SCORES

Balancing academic responsibilities with part-time jobs, personal commitments, or other priorities can be overwhelming—I completely understand. That's where I come in to make your life easier! As a dedicated nursing student with a passion for helping peers succeed, I specialize in providing high-quality study resources on stuvia including ATI modules and other essential certifications, earning excellent ratings and a stellar reputation for boosting students' grades. My commitment to excellence ensures that each resource is meticulously crafted to support your academic journey and professional growth in nursing. Join my satisfied buyers and take your studies to the next level with my expertly designed materials. Don’t hesitate to reach out for assistance. My comprehensive study guides, detailed notes, and curated test banks are guaranteed to deliver excellent results. Here’s what you can expect from my offerings: Up-to-date exams and assignments Detailed test banks with verified questions and answers Elaborate exam solutions Case studies and discussions Customized package deals tailored to your needs I’m committed to providing only high-quality documents to ensure the best outcomes. Get instant access to expertly prepared materials designed to help you excel in your academic journey. Reach out today and take a step closer to achieving your goals!

Lees meer Lees minder
0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen