Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

SOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERS

Rating
-
Sold
-
Pages
69
Grade
A+
Uploaded on
12-11-2025
Written in
2025/2026

SOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERS SOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERS SOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERS

Institution
SOS NERC Prep
Course
SOS NERC Prep

Content preview

SOS NERC Prep - RELIABILITY EXAM QUESTIONS & ANSWERS
/73, /73, /73, /73, /73, /73, /73, /73,




The Reliability Coordinator just informed you of a slow time error correction which
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




will begin at the top of the next hour. Your EMS system will not let you change your
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




scheduled frequency. Your FrequencyBias Setting is -100 MW/.1Hz. What action
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




should you take?
/73, /73, /73,




A) Increase Net Interchange Schedule by 20 MWs. /73, /73, /73, /73, /73, /73,




B) Informthe Reliability Coordinator thatyou cannot participate in the time error /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




correction.
/73,




C) Decrease Net Interchange Schedule by20 MWs. /73, /73, /73, /73, /73, /73,




D) Increase Net Interchange Schedule by 10 MWs. - A) IncreaseNet Interchange /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




Schedule by 20 MWs.
/73, /73, /73, /73,




A Balancing Authority has a sudden loss of a large block of load in its area. This losswill
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




beseen instantaneously in the change of which of the following values?
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /7 3 ,




1. Actual Net Interchange /73, /73,




2. Scheduled Frequency /73,




3. Scheduled Net Interchange /73, /73,




4. Area Control Error /73, /73,




A) 4 only /73,




B) 1 & 3 /73, /73,




C) 1 & 4 /73, /73,




D) 3 & 4 - C) 1 & 4 /73, /73, /73, /73, /73, /73, /73,




Metered Data included in the calculationofACE are: dynamic schedules, pseudo ties,
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




actual frequency, and all
/73, /73, . /73, /73, /73,




A) Tie lines readings /73, /73,




B) Generatorsoutput /73,




C) Scheduledfrequencyindications /73, /73,

,D) Transformer load - A) Tie lines readings /73, /73, /73, /73, /73, /73,




Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /7 3, /73, /73,




Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE?
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




A) -100
B) 0
C) 10
D) 100 - A) -100 /73, /73, /73,




A Balancing Authority has a Net Interchange Schedule of -250 MWs from1200to 1600
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




on a summer day. The Net Interchange Actual for those same hours respectively were
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




-230 MW, -275 MW, -250 MW and -270 MW. What was the Balancing Authority's
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




Inadvertent Interchange for the 4-hour period?
/73, /73, /73, /73, /73, /73,




A) 6 MWs out /73, /73,




B) 25 MWs in /73, /73,




C) 25 MWs out /73, /73,




D) 6 MWs in - B) 25 MWs in /73, /73, /73, /73, /73, /73, /73,




For the ACE equation to work properly, dynamic schedules, pseudoties,
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




frequency, and all
/73, must be metered. /73, /73, /73, /73, /73,




A) Generation
B) Communications
C) Transformers
D) Tie lines - D) Tie lines /73, /73, /73, /73, /73,




If the frequency bias setting is set to a less negative value than the frequency response
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




of a Balancing Authority and a frequencyincrease is caused bya sudden loss of load in an
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




external balancing area, what will be the result?
/73, /73, /73, /73, /73, /73, /73, /73,




A) The ACE will bezero and will take no AGC action /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




B) TheACE will be anegative value and AGC willincrease generation /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,

,C) TheACE will be a positive value and AGC will lower generation
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




D) This will not affect the ACE - B) The ACE will be a negative value and AGC will
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




increase generation
/73, /73,




If the frequencybias setting is less negative than the frequency response of a Balancing
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




Authority and a frequency decline is caused by a sudden loss of generation in an
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




external balancing area, what will be the result?
/73, /73, /73, /73, /73, /73, /73, /73,




A) The ACE willbea negative value and AGC will increase generation.
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /7 3 ,




B) This willnot affect the ACE. /73, /73, /73, /73, /73,




C) TheACE will be a positive value and AGC will lower generation.
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




D) The ACE will be zero and will takeno AGC action. - C) The ACE will be a
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




positive value and AGC will lower generation.
/73, /73, /73, /73, /73, /73, /73,




It is the responsibility of which entity/entities to develop, maintain, andimplement load
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




shedding plans?
/73, /73,




A) Transmission OperatorsandBalancingAuthorities /73, /73, /73, /73,




B) ReliabilityCoordinator /73,




C) Load Serving Entities /73, /73,




D) Balancing Authority -A)TransmissionOperators and Balancing Authorities /73, /73, /73, /73, /73, /73, /73, /73,




A Transmission line is loaded 25% above its SOL. A parallel line is out for routine
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




maintenance and can be placed in service in 10 minutes. What is the first step the
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




Operator should take to reduce the line loading?
/73, /73, /73, /73, /73, /73, /73, /73,




A) Shed load at the downstreambus. /73, /73, /73, /73, /73,

, B) Open the line. /73, /73,




C) Re-DispatchGeneration. /73,




D) Initiate the restoration of the parallel line. - D) Initiate the restoration of the
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




parallel line.
/73, /73,




As a Transmission Operator, you realizethat the voltagelevelis starting to decline in the
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




North West part of the system. Which of the following devices should you, as a
/73, /73, /73, /73, /73, /73, /73, / 73, /73, /73, /73, /73, /73, /73, /73,




Transmission Operator, be able to operate, and/or have another entity operate to raise
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




the voltage level back to normal in the North West part of the system?
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




A) TransformerUnderload TapChangers /73, /73, /73,




B) ShuntCapacitorBanks /73, /73,




C) GeneratorReactiveOutput /73, /73,




D) All answers are correct - D) All answers are correct
/73, /73, /73, /73, /73, /73, /73, /73, /73,




Voltage reduction for load relief should be made on the
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, .

A) Distributionsystem /73,




B) EntireInterconnectionsimultaneously /73, /73,




C) Tie-lineswith otherBalancing Authority Areas /73, /73, /73, /73, /73,




D) Transmission System-A)Distributionsystem /73, /73, /73, /73, /73,




Under Frequency Load Shedding (UFLS)istostabilize the imbalancebetween
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




generation and load that has been created by a system disturbance. This is
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




accomplished by
/73, . /73, /73,




A) Trippinggeneration first /73, /73,




B) Voltagereductiononthedistributionsystem. /73, /73, /73, /73, /73,




C) Shedding all load to arrest frequency /73, /73, /73, /73, /73,




D) Shedding load prior to generation tripping - D) Shedding load prior to /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,




generation tripping
/73, /73,

Written for

Institution
SOS NERC Prep
Course
SOS NERC Prep

Document information

Uploaded on
November 12, 2025
Number of pages
69
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$17.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
HAVENSTUVIA Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
14
Member since
4 year
Number of followers
7
Documents
504
Last sold
3 weeks ago
HAVENS STORES

Having problems with assignments? Tough exams? Am an online tutor dealing with major courses in psychology, Nursing, Mathematics . I provide valid study resources in the form of study notes and exam reviews that guarantee excellent grades in your exams and assignments.

3.0

2 reviews

5
0
4
0
3
2
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions