b.NERC OperatingCommittee -What group can approve a change
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
in the Disturbance Recovery Period for an Interconnection?
/73, /73, /73, /73, /73, /73, /73, /73,
a. NERCInterconnection WorkingGroup /73, /73, /73,
b. NERCOperating Committee /73, /73,
c. NERC Regional Council /73, /73,
d. NERCDisturbanceAnalysisWorkingGroup /73, /73, /73, /73,
c. Check targets andequipment - What is the first thing anoperator should do after a relay
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
operation?
/73,
a. Check power systemstabilizers /73, /73, /73,
b. Notifyadjacent Transmission and Balancing areas /73, /73, /73, /73, /73,
c. Check targetsandequipment /73, /73, /73,
d. Notifytheir PSE that the transmission pathis outof service /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
c. Tie Lines - For theACE equation to work properly, dynamic schedules, pseudo ties,
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
frequency calculations, and all
/73, /73, /73, /73, /73, must be metered. /73, /73,
a. Communications
b. Transformers
c. Tie Lines /73,
d. Generation
c. Energy EmergencyAlert Level I - WhatEnergy Alert Level would the following
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
example be categorized as?
/73, /73, /73, /73,
"A Balancing Authority, Reserve Sharing Group, or Load Serving Entity foresees, or is
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
experiencing conditions where all available resources are committed to meet firm
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
load, firm transactions, etc, and requests an Energy Emergency Alert."
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
, a. EnergyEmergency Alert Level IV /73, /73, /73, /73,
b. EnergyEmergency Alert Level III /73, /73, /73, /73,
c. EnergyEmergency Alert Level I /73, /73, /73, /73,
d. EnergyEmergency Alert Level II /73, /73, /73, /73,
b. Implement the appropriate congestion management procedure. - You are a
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
Reliability Coordinator in the Eastern Interconnection. A flow gate has become
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
overloaded because a parallel 345kV line has relayed out and part of that load has
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
transferred over to the flow gate causing an SOL and possible IROL violation. What
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
would you do to relieve this violation?
/73, /73, /73, /73, /73, /73, /73,
a. Notify another Reliability Coordinator and ask themif they are having any
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
problem, and what should you do.
/73, /73, /73, /73, /73, /73,
b. Implementtheappropriate congestion managementprocedure. /73, /73, /73, /73, /73,
c. Issue aTransmission warning to the Transmission Operators that lost the 345kV line.
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
d. Placethe line back in service within 30 minutes.
/73, /73, /73, /73, /73, /73, /73, /73,
b.Adjacent Balancing Authorities -Interchangeschedules may be implemented
/73, /73, /73, /73, /73, /73, /73, /73, /73,
between
/73, /73, .
a. Sourceand Sink Balancing Authorities /73, /73, /73, /73,
b. AdjacentBalancing Authorities /73, /73,
c. Sending,Receiving andIntermediate Balancing Authorities inthesame Region. /73, /73, /73, /73, /73, /73, /73, /73, /73,
d. Balancing Authorities in thesameInterconnection. /73, /73, /73, /73, /73,
a. Frequencywill continue to drop, generator governor response, decreaseinload. /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
- When the frequency of an Interconnection decreases due to the loss of a large
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
generator, the
/73, /73, /73, until the combination of both /73, /73, /73, /73, /73,
and
/73, /73, replace the output of the lost generator. /73, /73, /73, /73, /73, /73,
, a. Frequencywill continue todrop, generator governor response, decreaseinload /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
b. Frequencywill continue todrop,generator governor response, voltage /73, /73, /73, /73, /73, /73, /73, /73,
/73, regulating transformer response /73, /73,
c. Voltage will continue to raise, generator AVR response, voltage regulating /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, transformer response /73,
d. Voltage will continue to raise, generator AVR response, decreasein load /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
a. That all involved reliability entities determined that there is no reliability
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, problems with the Arranged Interchange. - In developing and setting up an
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, Arranged Interchange, which ofthe following wouldtransition the Arranged
/73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, Interchange to the Confirmed Interchange status? /73, /73, /73, /73, /73,
a. That allinvolved reliability entitiesdetermined thatthere isno reliability
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, problems with the Arranged Interchange. /73, /73, /73, /73,
b. The Department of Energy (DOE) made an in-depth study of the Interchange
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, Agreement and determined that it would have an adverse affect on the /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, Interconnection.
c. There are available resources to meet the load. /73, /73, /73, /73, /73, /73, /73,
d. All parties involved realized that theywould notlose money for their company with
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, this Interchange Agreement.
/73, /73,
b. He violated NERC standards - Early in the afternoon, a system operator notices that
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
frequencyhas dropped to 59.95Hz and hisbalancing area's ACE is 0. In order to correct
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, the under frequency condition, the operator pulses his generators to increase
/73, /73, /73, /73, /73, /73, /73, /73, /73, /73,
/73, generation. Which statement best describes his actions? /73, /73, /73, /73, /73, /73,
a. He followed NERC guidelines
/73, /73, /73,
b. He violated NERC standards
/73, /73, /73,
c. He helped the system /73, /73, /73,
d. Hehas not impacted the system
/73, /73, /73, /73, /73,