Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Information Technology Project Management 9th Edition - Test Bank by Kathy Schwalbe

Beoordeling
-
Verkocht
-
Pagina's
461
Cijfer
A+
Geüpload op
12-11-2025
Geschreven in
2025/2026

This document provides the full test bank for Information Technology Project Management (9th Edition) by Kathy Schwalbe, featuring a comprehensive set of multiple-choice, true/false, and scenario-based questions with correct answers and explanations. It covers all chapters, including an introduction to project management, project life cycle and organization, project integration management, scope, time, cost, quality, human resource, communications, risk, procurement, and stakeholder management. Aligned with PMBOK® Guide principles, this test bank is ideal for students, instructors, and professionals preparing for IT project management exams or certifications.

Meer zien Lees minder
Instelling
Information Technology Project Management, 9e
Vak
Information Technology Project Management, 9e

Voorbeeld van de inhoud

Information Technology Project
ST
Management – 9th Edition
UV

TEST BANK
IA
_A

Kathy Schwalbe
PP
RO
Comprehensive Test Bank for Instructors and

Students
VE

© Kathy Schwalbe
D?
All rights reserved. Reproduction or distribution without permission is prohibited.
??

©STUDYSTREAM

, True / False

1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.
ST
a. True
b. False
ANSWER: True
SUT
RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing
schedule and resource data to top management in the military, computer, and
construction industries. Today’s project management involves much more, and
people in every industry and every country manage projects.
UV
POINTS: 1
DIFFICULTY: Difficulty: Easy
VIAI
REFERENCES: p.2
LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1
NATIONAL STANDARDS: United States - BUSPROG: Technology
A__A
TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge


2. A difference between operations and projects is that operations end when their objectives have been
APP
reached, whereas projects do not.
a. True
b. False
ANSWER: False
PPR
RATIONALE: Feedback: Projects are different from operations in that they end when their
objectives have been reached or the project has been terminated.
POINTS: 1
RO
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.4
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
VEE
KEYWORDS: Bloom's: Comprehension


3. Every project should have a well-defined objective.
DD?
a. True
???
?
Page 2 of 457

, 2



b. False
ANSWER: True
ST
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-defined
objective.
POINTS: 1
SUT
DIFFICULTY: Difficulty: Easy
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
UV
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge
VIAI
4. Projects should be developed in increments.
a. True
A__A
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often
defined broadly when they begin, and as time passes, the specific details of the
project become clearer. Therefore, projects should be developed in increments.
APP
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.6
PPR
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
RO
KEYWORDS: Bloom's: Comprehension


5. Resources in a project should be used effectively because they are limited.
a. True
b. False
VEE
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas. Resources,
however, are limited and must be used effectively to meet project and other
corporate goals.
DD?
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p. 7
???
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension
?
Page 3 of 457

, 3



6. A project manager’s primary role is to provide the funding for a project.
a. True
ST
b. False
ANSWER: False
RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a project.
SUT
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
UV
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
VIAI
KEYWORDS: Bloom's: Knowledge


7. One of the main reasons why project management is challenging is because of the factor of uncertainty.
A__A
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it is
APP
sometimes difficult to define its objectives clearly, estimate how long it will take to
complete, or determine how much it will cost. This uncertainty is one of the main
reasons project management is so challenging.
POINTS: 1
PPR
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
RO
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension


8. Questions about how a team will track schedule performance is related to a project’s scope.
VEE
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Project scope deals with questions such as, “What work will be done as
DD?
part of the project?”, “What unique product, service, or result does the customer or
sponsor expect from the project?”, or “How will the scope be verified?”
POINTS: 1
???
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Technology
?
Page 3 of 457

Geschreven voor

Instelling
Information Technology Project Management, 9e
Vak
Information Technology Project Management, 9e

Documentinformatie

Geüpload op
12 november 2025
Aantal pagina's
461
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$20.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
StudyStream Howard Community College
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
107
Lid sinds
2 jaar
Aantal volgers
30
Documenten
1227
Laatst verkocht
2 weken geleden
StudySteam - Verified Solutions, Test Banks & Guides for Medical, Nursing, Business, Engineering, Accounting, Chemistry, Biology & Other Subjects

Welcome to Your Exam Success Headquarters! Tired of endless textbook reading? Our shop is your go-to for high-quality, exam-ready study materials designed for university and college students. We specialize in original publisher content, including solutions manuals, test banks, and comprehensive study guides across a wide range of subjects. Every document is an instant PDF download – no waiting, no fuss! Get immediate access to top-tier academic resources like step-by-step solutions and real test formats to truly ace your coursework and exams. Our materials are perfect for exam preparation, offering insights and practice for every study style. Ready to boost your grades? Dive in and discover your next A+ resource. Found something great? Share our shop with your classmates – let's achieve success together!

Lees meer Lees minder
3.9

14 beoordelingen

5
7
4
3
3
1
2
1
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen