Factors that affect availability .....Answer.....Operational
Requirements, Operational Availability, Impact of Downtime, All
of the above
Entrance room designer's meeting purpose .....Answer.....To
determine their electrical, space, interface, and other facility
requirements
Common energy storage solution types .....Answer.....Lead-acid
battery, vented and valve regulated
,age 2 of 30
Telecommunications room location for operations center
.....Answer.....Within a designated telecommunication space
outside of computer rooms
Thermal load calculation for lighting system .....Answer.....Rated
power * .02
Single bus vs dual bus power distribution system
.....Answer.....Single bus has only one power source while dual
bus has two independent power sources
Speed and distance limitations of ESCON .....Answer.....17 MB/s
@ up to 60km
Recommended fuel supply for class F0 data center
.....Answer.....None - No requirements
Air changes per hour inside equipment room .....Answer.....0.25
, age 3 of 30
IBC occupancy category for data centers post-earthquake
.....Answer.....Category 2
Storage room location .....Answer.....Away from computer room,
adjacent to equipment entrance at data center
Rooms that may require 2 exits .....Answer.....The electrical Room
and battery room
Recommended low temperature range for data center
.....Answer.....64.4 degrees
Recommended temperature range for a data center
.....Answer.....20-24°C (68-75°F)
Minimum sized conductor from rebar mat foundation
.....Answer.....4 AWG