1. The means for enforcing contract compliance are provided in
the: - correct answer -Contract clauses of the contract.
2. ENG Form 4288-R, the submittal register: - correct answer -
Identifies those submittals requiring government approval
3. The primary purpose of the Three-Phase control system is to: -
correct answer -Require the contractor to plan and schedule
his work.
4. The contractor is required to conduct a preparatory phase
meeting before he begins any definable feature of work except
when: - correct answer -There are no exceptions to the rule.
5. The ____________________ is the appropriate time to assure
that all materials and/or equipment have been tested,
submitted, and approved. - correct answer -Preparatory phase
, Page | 2
6. The ____________________ is workmanship oriented, and
where workmanship standards are established. - correct
answer -Initial phase
7. The contract requires the contractor to submit quality control
reports: - correct answer -Daily.
8. The Quality Control report should address: - correct answer -
Both work completed and control activities
9. The Quality Assurance Report is the governments record of
project-related events and is prepared _______________. -
correct answer -For each visit day
10. Grounds for withholding payment include the contractors
failure to: - correct answer -Perform in accordance with the
terms of the contract, provide a Quality Control Plan giving
assurance of intent and ability to comply with quality standards,
and build to the quality standards established by the contract.