Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

APICS CPIM BSCM Session 5 Capacity Management and Production Activity Control ACTUAL QUESTIONS AND CORRECT ANSWERS

Beoordeling
-
Verkocht
-
Pagina's
7
Cijfer
A+
Geüpload op
15-11-2025
Geschreven in
2025/2026

APICS CPIM BSCM Session 5 Capacity Management and Production Activity Control ACTUAL QUESTIONS AND CORRECT ANSWERS capacity available - CORRECT ANSWERSThe capability of a system or resource to produce a quantity of output in a particular time period load - CORRECT ANSWERSThe amount of planned work scheduled for and actual work released to a facility, workcenter, or operation for a specific span of time efficiency - CORRECT ANSWERSA measurement, usually expressed as a percentage, of the actual output to the standard output expected forward scheduling - CORRECT ANSWERSA technique where the scheduler proceeds from a known start date and computes the completion date for an order, usually proceeding from the first operation to the last capacity requirements - CORRECT ANSWERSThe resources needed to produce the projected level of work required from a facility over a time horizon infinite loading - CORRECT ANSWERSCalculation of the capacity required at work centers in the time periods required regardless of the capacity available to perform this work backward scheduling - CORRECT ANSWERSA technique where the schedule is computed starting with the due date for the order and working backward to determine the required start date or due dates for each operation rated capacity - CORRECT ANSWERSThe expected output capability of a resource or system. Hours available × efficiency × utilization finite loading - CORRECT ANSWERSAssigning no more work to a work center than it

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

APICS CPIM BSCM Session 5 Capacity
Management and Production Activity
Control ACTUAL QUESTIONS AND
CORRECT ANSWERS
capacity available - CORRECT ANSWERS✅✅The capability of a system or resource to
produce a quantity of output in a particular time period


load - CORRECT ANSWERS✅✅The amount of planned work scheduled for and actual
work released to a facility, workcenter, or operation for a specific span of time


efficiency - CORRECT ANSWERS✅✅A measurement, usually expressed as a percentage,
of the actual output to the standard output expected


forward scheduling - CORRECT ANSWERS✅✅A technique where the scheduler proceeds
from a known start date and computes the completion date for an order, usually proceeding
from the first operation to the last


capacity requirements - CORRECT ANSWERS✅✅The resources needed to produce the
projected level of work required from a facility over a time horizon


infinite loading - CORRECT ANSWERS✅✅Calculation of the capacity required at work
centers in the time periods required regardless of the capacity available to perform this work


backward scheduling - CORRECT ANSWERS✅✅A technique where the schedule is
computed starting with the due date for the order and working backward to determine the
required start date or due dates for each operation


rated capacity - CORRECT ANSWERS✅✅The expected output capability of a resource or
system. Hours available × efficiency × utilization


finite loading - CORRECT ANSWERS✅✅Assigning no more work to a work center than it
can be expected to execute in a given time period

, control - CORRECT ANSWERS✅✅Comparing actual to planned performance and taking
corrective action, as needed, to align performance with plan


production activity control (PAC) - CORRECT ANSWERS✅✅The function of routing and
dispatching the work to be accomplished through the production facility and of performing
supplier control


utilization - CORRECT ANSWERS✅✅A measure (usually expressed as a percentage) of
how intensively a resource is being used to produce a good or service. This measure
compares actual time used to available time. Traditionally, this measure is the ratio of direct
time charged (run time plus setup time) to the clock time available


b. 58 Hours


Rated capacity = available time x utilization x efficiency = (2 machines x 8 hours/day x 5
days) x 0.8 x 0.9 = 57.6 hours, or 58 hours) - CORRECT ANSWERS✅✅A work center
consists of two machines working eight hours a day and five days a week. Historically,
utilization has been 80%, and efficiency has been 90%. To the nearest hour, what is the rated
capacity?


a. 80 Hours


b. 58 Hours


c. 40 Hours


d. 30 Hours


c. Utilization


Utilization = hours actually worked/hours of available time. Answer a is incorrect because
efficiency measures standard hours of work produced per actual hours worked, not the
percentage of time worked. Answer b is not relevant to the question. Answer d relates to the

Geschreven voor

Vak

Documentinformatie

Geüpload op
15 november 2025
Aantal pagina's
7
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
GENIOUSTOPCLASS
3.0
(1)

Maak kennis met de verkoper

Seller avatar
GENIOUSTOPCLASS Stanford
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
11 maanden
Aantal volgers
0
Documenten
1857
Laatst verkocht
7 maanden geleden
ACADEMIC EXAMS PLATFORM

I create high-quality, easy-to-understand academic documents to help students learn faster and perform better. My materials are well-researched, clearly organized, and cover key exam topics to make studying simple and effective.

3.0

1 beoordelingen

5
0
4
0
3
1
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen