FULL QUESTIONS AND VERIFIED
SOLUTIONS
⩥ 1. Carry out FPTs on all HVAC systems
2. Train the O&M staff for effective, ongoing operations and
maintenance of all systems
3. Provide full documentation. Answer: Comprehensive Commissioning
Acceptance phase
⩥ 1. Correct any deficiencies, carry out required re-testing
2. Carry out any required "off-season" tests
3. Update documentation as required. Answer: Comprehensive
Commissioning Post-Acceptance phase
⩥ . Answer: Identify the Comprehensive HVAC commissioning
organizational structure for Plan & Spec
⩥ 1. Authority leads the commissioning process, and works
cooperatively with the designers and contractors, but always in the
owner's interest
, 2. Facilitates communication and coordination among designers,
contractors and suppliers.. Answer: During commissioning what
statements identify the CxA's role?
⩥ . Answer: Identify the Comprehensive HVAC commissioning
organizational structure for Design Build
⩥ The Owner. Answer: If the project uses the traditional plan and spec
process, the commissioning authority will typically report directly to
who?
⩥ Takes place during the construction,
acceptance and post-acceptance phases of the project.. Answer: Define
Construction HVAC Commissioning—New Construction.
⩥ Chapter 6. Answer: Which Chapter of the ACG guideline identifies
detailed methodology for Contruction HVAC Commissioning?
⩥ 1. Eliminates the pre-design and design phase planning and
preparation included in Comprehensive HVAC Commissioning.
2. Negative impact on commissioning effectiveness, and produces very
little cost savings.
3. Contractor has little or no advance warning that Cx will occur.