What 4 distinct phases of Grading and Land Development
construction activities Streets and Utilities
does the General Permit Vertical Construction
Recognize Final Landscaping and site Stabilization
Any construction or 1
demolition activity,
including, but not limited
to, clearing, grading,
grubbing, or excavation,
or any other activity that
results in a land
DISTURBANCE of equal to
or greater than ___ acre
LUPs Linear Underground/Overhead Utility Projects
What is the primary Clean Water Act
federal law governing
storm water pollution and
regulation
, The person in charge of LUP
the utility company,
municipality, or other
public or private company
or agency that owns or
operates the ____ may also
serve as the LRP
Visual Monitoring is All sites subject to this General Permit
required for...
Records are required to 3 Years
remain onsite during the
construction period for a
minimum of ___
When does Risk Level 1 When required for non-visible pollutants
site have to sample?
Effluent that exceeds the receiving water monitoring
When would receiving
triggers contained in the GP and with direct
water monitoring occur?
discharges to receiving water
When would RISK level 3 and LUP Type 3 Sites larger than 30 acres
bioassessment sampling and with direct discharges to receiving waters.
take place? (before and after sire completion)
At the construction site until construction is complete.
Where do records need to
LUPs may be retained in a crew members vehicle and
be available?
made available upon request
ATS Active Treatment Systems
Add chemicals to facilitate flocculation, coagulation
What do ATS do? and filtration of suspended sediment particles.
Measured by NELs
When does risk level 1 site When required for non-visible pollutants
have to sample
with verified Answers (Latest Update 2025)
UPDATE!!
Save
Terms in this set (129)
What 4 distinct phases of Grading and Land Development
construction activities Streets and Utilities
does the General Permit Vertical Construction
Recognize Final Landscaping and site Stabilization
Any construction or 1
demolition activity,
including, but not limited
to, clearing, grading,
grubbing, or excavation,
or any other activity that
results in a land
DISTURBANCE of equal to
or greater than ___ acre
LUPs Linear Underground/Overhead Utility Projects
What is the primary Clean Water Act
federal law governing
storm water pollution and
regulation
, The person in charge of LUP
the utility company,
municipality, or other
public or private company
or agency that owns or
operates the ____ may also
serve as the LRP
Visual Monitoring is All sites subject to this General Permit
required for...
Records are required to 3 Years
remain onsite during the
construction period for a
minimum of ___
When does Risk Level 1 When required for non-visible pollutants
site have to sample?
Effluent that exceeds the receiving water monitoring
When would receiving
triggers contained in the GP and with direct
water monitoring occur?
discharges to receiving water
When would RISK level 3 and LUP Type 3 Sites larger than 30 acres
bioassessment sampling and with direct discharges to receiving waters.
take place? (before and after sire completion)
At the construction site until construction is complete.
Where do records need to
LUPs may be retained in a crew members vehicle and
be available?
made available upon request
ATS Active Treatment Systems
Add chemicals to facilitate flocculation, coagulation
What do ATS do? and filtration of suspended sediment particles.
Measured by NELs
When does risk level 1 site When required for non-visible pollutants
have to sample