Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

VA DEQ ESC Inspector Exam

Rating
-
Sold
-
Pages
30
Grade
A+
Uploaded on
17-11-2025
Written in
2025/2026

VA DEQ ESC Inspector Exam

Institution
VA DEQ ESC
Course
VA DEQ ESC

Content preview

VA DEQ ESC Inspector Exam questions with
answers,


VESCP - AnswerVirginia Erosion and Sediment Control Program



- Administered by counties/cities (must), towns (may)

- MUST BE APPROVED



Minimum Standard 1 - AnswerStabilization



permanent or temporary soil stabilization shall be applied to denuded areas within seven days after
final grade is reached on any portion of the site; temporary soil stabilization shall be applied within
seven days to denuded areas that may not be at final grade but will remain dormant for longer than
14 days; permanent stabilization shall be applied to areas that are to be left dormant for more than
one year



Site NOT at Final Grade - Answer- stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year



Site at Final Grade - Answer- stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw



Minimum Standard 2 - AnswerStock Piles, Waste and Borrow Areas

,during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment
trapping measures



mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and
detains from disturbed areas



Minimum Standard 3 - AnswerPermanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is
achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no %
associated with this*)



reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety



Minimum Standard 4 - AnswerFirst-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap
sediment shall be constructed as a first step in any land-disturbing activity and shall be made
functional before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for equipment to
install the perimeter controls, but site clearing and grading should be kept to a minimum until the
perimeter controls are in place



intercepts and detains small amounts of sediment from disturbed areas during construction
operation to prevent sediment from leaving the site and decrease velocity of sheet flows and low-
to-moderate level channel flow

, Perimeter Controls - Answerassures that sediment does not leave the perimeter of the land-
disturbing area once site clearing, grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary
diversions, diversions



Minimum Standard 5 - AnswerEarthen Structure Stabilization

stabilization cmeasures cshall cbe capplied cto cearthen cstructures csuch cas cdams, cdikes, cand cdiversions
cimmediately cafter cinstallation




reduce cerosion cand csedimentation cand creduce cdamage cfrom csediment cand crunoff cto cdownstream
cor coff-site careas




Minimum cStandard c6 c- cAnswerTraps cand cBasins



sediment ctraps cand cbasins cshall cbe cdesigned cand cconstructed cbased cupon cthe ctotal cdrainage carea
c(not cjust cdisturbed carea) cto cbe cserved cby cthe ctrap cor cbasin




Sediment cTraps c- cAnswerminimum cstorage ccapacity cshall cbe c134 ccubic cyards cper cacre cof cdrainage
carea cand cshall conly ccontrol cdrainage careas cless cthan c3 cacres




*stone coutlet c= ctrap*



Sediment cBasins c- cAnswersurface crunoff cfrom cdisturbed careas cthat cis ccomprised cof cflow cfrom
cdrainage careas cgreater cthan cor cequal cto c3 cacres cshall cbe ccontrolled cby ca cbasin; cminimum cstorage


ccapacity cof ca csediment cbasin cshall cbe c134 ccubic cyards cper cacre cof cdrainage carea; cthe coutfall csystem


cshall, cat ca cminimum, cmaintain cthe cstructural cintegrity cof cthe cbasin cduring ca c25-year cstorm cof c24-


hour cduration; crunoff ccoefficients cused cin crunoff ccalculations cshall ccorrespond cto ca cbare cearth
ccondition cor cthose cconditions cexpected cto cexist cwhile cthe csediment cbasin cis cutilized.




Sediment cTrapping cDevises c- cAnswer1. cplace cnear cthe clowest cdrainage cpoints cof ca cproject

Written for

Institution
VA DEQ ESC
Course
VA DEQ ESC

Document information

Uploaded on
November 17, 2025
Number of pages
30
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
Stuviaguider

Get to know the seller

Seller avatar
Stuviaguider Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
5 months
Number of followers
0
Documents
77
Last sold
-
Stuviaguider

BEST HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ or EXAM WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management.Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why i'm one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions