CEFP Practice Exam
project managers PM - ANSWER-programming, inspections,
scheduling, and
punch lists are typical
duties for
risk management/environmental health and safety - ANSWER-
compliance and
code enforcement are critical campus elements that
should be effectively
addressed by what typical campus
department
construction management at risk delivery method -
ANSWER-reduction of
change orders on construction contracts can be better
managed by use of
,design-build - ANSWER-some institutions are allowed to use
other construction
and delivery methods besides traditional design/bid/build.
select one such
method that can save
time
HEGIS codes - ANSWER-space planning standards are
effective and
incorporate academic space types that are
referred to as
Geographic Information System (GIS) - ANSWER-utility master
plans are critical
in mapping all utilities above and below grade using
current technology
schematic design SD - ANSWER-the process of
commissioning a new facility
begins at what
stage
means, methods, and materials - ANSWER-value engineering
VE measures for
construction and projects includes
consideration for
look/learn/listen then develop short, medium, and long term
goals to share with
,staff - ANSWER-the best approach coming into this situation
is the following
conduct a culture climate survey - ANSWER-what is the
best method for
assessing the current facilities management
culture on campus
conduct a customer satisfaction survey for key service users -
ANSWER-what is
the best method for assessing current customer
satisfaction
space is free - ANSWER-which attitude is a major
contributor to space
inefficiency
user requirements - ANSWER-which is a key element of the
building program
for a new
facility
room or space data sheets - ANSWER-which important
component of a facility
program provides a unique way to communicate baseline
information about
every space in a building
program
, variable rate financing - ANSWER-which financing option
for a new facility
would be best in a strong economy with stable
interest rates
facility programming - ANSWER-a projects stakeholders want
to identify conflicts and prioritize needs to stay within budget.
what should be performed before any design begins
obtain a survey showing all existing utility locations -
ANSWER-a manager of
utilities is asked to develop a budget to connect a new building
to the campus
utility system. the first
step is to
a proposed capital expenditure is not likely to be in
conformance - ANSWER-in
which situation will an amendment to the campus master
plan be presented
amount or quantity - ANSWER-what is one of the five
components of space
master plan - ANSWER-which plan defines a broad physical
framework for campus land use, facility location, circulation,
natural systems, infrastructure, and overall space organization