gg gg
Solution
A+ Page 1
gg
,Created By: A gg gg
Solution
SolutionsManualforElectricalWiringCommer
cial18th Editionby Phil Simmons A+
g gg gg gg gg
Solution and Answer Guide gg gg gg
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, G G G G G G G G G G G G
9780357767115; CHAPTER
GG 1:COMMERCIAL BUILDING PLANS AND SPECIFICATIONS GG G G G G GG GG GG
TABLE OF CONTENTS G G G G
Review .......................................................................................................................................................... 1
Note to instructor: It is recommended that students
gg gg gg gg gg gg gg g g be required to respond,
gg gg gg
where appropriate,
gg with
g g answers that are g g g g g g g g g gcomplete sentences. gg
REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
gg gg gg gg gg gg gg gg gg gg gg gg
gg applicable, responses should be written in complete sentences.
gg gg gg gg gg gg gg
1. What section of a commercial building’s specification contains a list of contract
gg gg gg gg gg gg gg gg gg gg gg
gg documents?
Answer: A list of the contract documents is contained in General Clauses and
gg gg gg gg gg gg gg gg gg gg gg gg
gg Conditions. A listing of the Commercial Building contract documents is presented in
gg gg gg gg gg gg gg gg gg gg gg
gg this chapter under the heading “Commercial Building Plans.” The instructor may wish to
gg gg gg gg gg gg gg gg gg gg gg gg
have the students check over this listing and compare it with the plans provided.
gg gg gg gg gg gg gg gg gg gg gg gg gg gg
2. The requirement for temporarylight and power at the job site will be found in what
gg gg gg gg gg gg gg gg gg gg gg gg gg gg
gg portion of a commercial building’s specification?
gg gg gg gg gg
Answer: The Supplementary General Conditions specifies the job site requirements for
gg gg gg gg gg gg gg gg gg gg
gg temporary light and power. In some contracts, this electrical system becomes the responsibility
gg gg gg gg gg gg gg gg gg gg gg gg
of the general contractor; in other contracts, it is the electrical contractor’s responsibility to
gg gg gg gg gg gg gg gg gg gg gg gg gg gg
gg install and maintain the temporary electrical system. The instructor maywish to refer the
gg gg gg gg gg gg gg gg gg gg gg gg
student to NEC Article 590 and discuss the requirements in detail.
gg gg gg gg gg gg gg gg gg gg gg
A+ Page 2
gg
,Created By: A
gg gg
Solution
3. The electrician uses the Schedule of Working Drawings for what purpose?
gg gg gg gg gg gg gg gg gg gg
Answer: The electrician uses the Schedule of Working Drawings to determine whether all
gg gg gg gg gg gg gg gg gg gg gg gg
of the drawings are at hand. The information on “the other sheets” may be very important,
gg gg gg gg gg gg gg gg gg gg gg gg gg gg gg gg
gg especially in coordinating with other contractors.
gg gg gg gg gg
4. Complete the following items by indicating the letter(s) designating the correct
gg gg gg gg gg gg gg gg gg gg
source(s) of information:
gg gg gg
No. Answer Item Information
4. Sections Ceiling height gg Sections, Sheet A6 gg gg
5. Electrical Electrical receptacle gg Electricalsymbolschedule,Chapter
gg symbol style
gg gg 2,Figure 2–6 gg
gg schedul
e
6. Electrical Electricaloutlet Electrical layout drawings, gg gg
gg layout location
gg Sheets El,E2, and E3
gg gg gg gg
gg drawin
g s gg
7. Elevations Exterior wall finishes gg gg Elevations, Sheets A4 and A5 gg gg gg gg
8. Site plan gg Grading elevations gg Site plan, Sheet A4
gg gg gg
9. Electrical Panelboard schedules gg Electrical layout drawings, Sheet E4
gg gg gg gg
gg layout
gg drawin
g s gg
10. Architectural Room width gg Architectural floor plan, Sheets gg gg gg
gg floor plan gg Al, A2,and A3
gg gg gg
11. Architectural Swing of door gg gg Architectural floor plan, Sheets Al, gg gg gg gg
gg floor plan gg A2,and A3 gg
A+ Page 3 gg
, Created By: A
gg gg
Solution
12. Sections View of interior
f ggf g g f gg wall Sections, Sheet A6
ggf f
A+ Page 4
gg