CUSP - T&D Questions And Answers.




As per CAN/ULC S801, on an electrical distribution overhead utility line circuit,
verification of voltage absence can be achieved by: - answer;-Using an approved
voltage detector.

Isolation and tagging (no locks) is acceptable on an overhead distribution circuit under
some of the following conditions, EXCEPT for: - answer;-The isolation can be operated
from the ground directly at the base of a structure.

Isolation and tagging (no locks) is acceptable for an overhead distribution circuit under
some of the following conditions: - answer;-1. The isolation point is a physical and visual
like a line cut or riser removed.
2. The isolation point can only be operated by the operating authority or qualified
worker.
3. The isolation point is protected from unauthorized access such as vertical height
spacing.

Consider that a circuit has been isolated, tagged and grounded. workers returning the
next day must: - answer;-Visually check grounds to verify they are in good order, secure
and test for voltage.

For lockout purposes, energy isolating devices shall be labelled or marked using a
standardized nomenclature and format to indicate their function. Identification shall
include: - answer;-The equipment type, energy type, and magnitude.

Utilities often use a permitting system due to special circumstances of which
conventional lockout is impracticable. The following is NOT a justified approach to this
process: - answer;-The isolation points are only simple single step actions.

A high voltage utility or electrical company is authorized to use Complex Lockout (tag
permitting) under what regulatory condition: - answer;-A variance application has been
approved by the provincial authority.

Utilities often use a permitting system due to special circumstances of which
conventional lockout is impracticable. The following are justified approaches to this
process: - answer;-1. The isolation points are located in remote areas with difficult or
restricted access.
2. The length of time to perform the lockout is impracticable.
3. Excessive numbers of persons required to lockout.

, CUSP - T&D Questions And Answers.




Work on a distribution line must consider the following items when performing isolation
and de-energizing of the circuit.: - answer;-1. Whether there are multiple sources of
energy (loop feed) on the circuit.
2. Is the line isolating device capable of interrupting load.
3. Is the line to be subject to inductive or capacitive charge.

According to the CAN/ULC S801, what is the LEAST DESIRABLE type of fall protection:
- answer;-Fall Arrest System (FAS)

Within Z259.14 standards fall restriction equipment (FRE) may only be leather in
subcomponents or elements that are NOT exposed to: - answer;-A dynamic load.

As per Z259 standards, energy absorbing lanyards shall be classified according to their
ability to absorb the kinetic energy from a fall as follows: - answer;-Class E4 (4.0 kN)
and Class E6 (6.0 kN) energy absorbing lanyards.

Assuming that the fall protection system is correctly being used, in what scenario might
the worker still contact the ground if they fell: - answer;-Working 16 feet up in a bucket
truck on distribution secondary services using a six foot shock absorbing lanyard,
connected to the approved bucket anchor.

What is NOT defined as a requirement of temporary vertical life lines as per Z259
standards: - answer;-100% polypropylene fibers provide the greatest breaking strength.

Requirements of temporary vertical life lines, as per Z259 standards: - answer;-1. Shall
be made from synthetic fibers with breaking strength of 27 kN or greater.
2. They shall be free of splices and knots, except at the terminations.
3. They shall be installed to protect against abrasion and sharp edges.

Working on an energized lattice tower requires emergency response consistent with the
associated hazards. What is NOT required as part of the emergency planning: -
answer;-Daily practice of tower rescue method.

Working on an energized lattice tower requires emergency response consistent with the
associated hazards, including: - answer;-1. A means to contact the operating authority
to de-energize the circuit.
2. Rescue equipment readily available to quickly and safely lower the worker.
3. Regular rescue practices on tower rescue at an appropriate frequency.

Geschreven voor

Vak

Documentinformatie

Geüpload op
19 november 2025
Aantal pagina's
14
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$12.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
bryanwalker859

Maak kennis met de verkoper

Seller avatar
bryanwalker859 All Types of Notes
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
10 maanden
Aantal volgers
0
Documenten
145
Laatst verkocht
6 maanden geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen