Unit price estimate - Answers Which type of estimate is the most accurate?
Advanced Work Packaging - Answers What does AWP stand for?
Lower initial cost. - Answers Which of these is not a reported benefit of AWP by the industry?
Construction Work Area - Answers The portion of the plot plan that has been defined jointly by
Engineering and Construction that represents a logical physical envelope of work is called:
Installation Work Package. - Answers The portion of work that contains all the necessary
elements for a single construction crew to complete that portion of the work is called:
Construction Work Package. - Answers The logical subdivision of a CWA construction scope
into a defined geographic area and discipline is called:
Work Breakdown Structure. - Answers The framework that represents the way a project is
defined, planned and managed by breaking down the scope into manageable segments is called:
Path of Construction. - Answers The optimal construction sequence to assemble the facility is
called the __________________, and should be defined during the early planning stages of a
project:
Plant performance. - Answers Which is NOT a potential result of AWP?
False - Answers The Critical Path Method reveals the contiguous path of activities in a network
having the shortest total duration and thus defining the minimum duration of the project
A-
Revise the schedules logic
B-
Use overtime
D-
Use substitute materials or equipment
E-
Increase crew size - Answers What are some ways to accelerate a schedule (check all that
apply)?
Request for information - Answers What does RFI stand for?
True - Answers Cost data provided by national firms (such as R.S.Means) must be adjusted to
, the specific project location.
False - Answers Quality construction is good, and every designer should specify the highest-
quality project components.
Increased availability of labor - Answers Which of the following will NOT increase the cost of a
project?
As quality expenditures increase, the value of the increased quality to the owner increases at a
decreasing rate. - Answers When considering project quality, which of the following is true?
Physical project size - Answers Which of the following is NOT a reason for construction cost
variation among different geographic locations?
Activity interrelations are not considered - Answers The following is a limitation of a bar chart
schedule.
Activity - Answers In a network schedule, what is the fundamental unit of work?
Network - Answers Activity on arrow and activity on node are both examples of which method of
scheduling?
Establish the project's objective - Answers Which of the following is the first step in the planning
and scheduling process?
True - Answers A matrix schedule provides the readability of a bar chart schedule while
addressing project logic.
Duration - Answers An increase in indirect costs could be directly attributable to an increase in
what aspect of a project?
True - Answers When estimates and schedules are initially prepared, unlimited resources are
assumed.
True - Answers To create an accurate coas flow projection, estimate and schedule information
must be accurately integrated.
Forecasting - Answers Which is the term that best describs the "projected outcome" for a
project?
True - Answers One important function of the documentation stage is storing project
information for future estimates, schedules, and project plans.
True - Answers Job diaries are subjective accounts of what occurred during the course of the
construction workday.
True - Answers An RFI is a formal request for information necessary to help clarify construction