Questions And Answers
/. licensee must have a permit to perform preventive termite treatments for - Answer-
✅new construction
/.every employee who performs wdo inspection must have received special training in,
but not limited to? - Answer-✅The biology, behavior, and identification of wdos with
particular emphasis on one's common in this state and the damage caused by such
organisms
/.each identification card holder must receive _____ hours of _____ training according
to chapter FS for 8 to - Answer-✅4, classroom
/.the fee for each Pest Control identification card is _____ according to 482 - Answer-
✅$10
/.copies of all wdo inspection shall be retained by the licensee for a. Of not less than
_____ years according to 482 - Answer-✅3
/.482 states that if periodic re-inspections or retreatments are specified in wdo
preventive or control contracts, the licensee shall furnish after such re-inspection or
retreatment _____? - Answer-✅a new wdo report
/.when a wdo inspection is provided in accordance with 482, the licensee shall post
notice of such inspection? - Answer-✅immediately adjacent to the attic access or crawl
space access
/.renewal notice of inspection must be at least _____ in size according to 482 and
consists of a material that will last at least ____ years? - Answer-✅3X5 in, 3 years
/.the wdo notice of inspection must include what information in accordance to 482? -
Answer-✅licensee name, address, date of inspection
/.according to FS for 8 to the wdo inspection report has a part that requires the inspector
to stay any visible accessible area is not inspected and the reason for not inspecting
them. What is the reason for this statement? - Answer-✅to allow a statement of fact
that in many situations the inspector is unable to inspect the entire structure due two
objects or reasons like Furnishings, appliances, structures, Landscaping, construction,
installation, ac ducts, difficult or no access, Etc.