How does the government relieve contractors of liability for loss or damage to property of the government that occurs after acceptance or results from defects or deficiencies? a. by acting as a self-insurer. b. by the contracting officer designating any item with a unit cost greater than $100,000 as a high value item for which the contractor is not liable. c. by relieving the contractor of liability for loss or damage to all contract end items. d. by requiring appropriate insurance be carried by contractors on cost reimbursement type contracts and reimbursing the contractor for the expense. - Answer a. by acting as a self-insurer. FAR 46.803(a) In response to a widely-publicized solicitation for a noncommercial item, a contracting officer only received one responsible offer. The offer is a firm-fixed amount for $1,000,000, which was the same price for a similar item recently purchased by another agency under a contract that resulted from adequate price competition. Which of the following is correct? a. One offer doesn't meet the requirement for adequate price competition, therefore, certified cost and pricing data is required b. The item is non-commercial, therefore, certified cost and pricing data is not required c. The offeror is responsible, therefore, certifed cost and pricing data is not required. d. The proposed price is reasonable in comparison to a recent price for a similar item, therefore, cost and pricing data is not required. - Answer d. The proposed price is reasonable in comparison to a recent price for a similar item, therefore, cost and pricing data is not required. FAR 15.403

Meer zien Lees minder
Instelling
CERTIFIED FEDERAL CONTRACTS MANAGER
Vak
CERTIFIED FEDERAL CONTRACTS MANAGER

Voorbeeld van de inhoud

CERTIFIED FEDERAL CONTRACTS
MANAGER (CFCM) STUDY GUIDE
NEWEST FULL TEST EXAM COMPLETE
2026 STUDY QUESTIONS WITH VERIFIED
CORRECT ANSWERS 100% GUARANTEED
PASS | ASSURED A+




Copyright@2026

,CERTIFIED FEDERAL CONTRACTS MANAGER (CFCM)
STUDY GUIDE NEWEST FULL TEST EXAM COMPLETE 2026
STUDY QUESTIONS WITH VERIFIED CORRECT ANSWERS
100% GUARANTEED PASS | ASSURED A+
How does the government relieve contractors of liability for loss or damage to property of the
government that occurs after acceptance or results from defects or deficiencies?



a. by acting as a self-insurer.

b. by the contracting officer designating any item with a unit cost greater than $100,000 as a high
value item for which the contractor is not liable.

c. by relieving the contractor of liability for loss or damage to all contract end items.

d. by requiring appropriate insurance be carried by contractors on cost reimbursement type
contracts and reimbursing the contractor for the expense. - Answer>>> a. by acting as a self-
insurer.



FAR 46.803(a)

In response to a widely-publicized solicitation for a noncommercial item, a contracting officer
only received one responsible offer. The offer is a firm-fixed amount for $1,000,000, which was
the same price for a similar item recently purchased by another agency under a contract that
resulted from adequate price competition. Which of the following is correct?



a. One offer doesn't meet the requirement for adequate price competition, therefore, certified cost
and pricing data is required

b. The item is non-commercial, therefore, certified cost and pricing data is not required

c. The offeror is responsible, therefore, certifed cost and pricing data is not required.

,d. The proposed price is reasonable in comparison to a recent price for a similar item, therefore,
cost and pricing data is not required. - Answer>>> d. The proposed price is reasonable in
comparison to a recent price for a similar item, therefore, cost and pricing data is not required.



FAR 15.403

When cancelling a purchase order, if the contractor accepts the cancellation and does not claim
that cost were incurred as a result of beginning performance under the purchase order, then



a. no further action is required and the purchase order shall be considered cancelled.

b. the contractor receives a cancellation fee equal to 10% of the original purchase order price.

c. the contracting officer shall process the termination action

d. The contractor is entitled to receive the automatic award of any purchase order for the same
item or service generated within 90 days of the cancellation. - Answer>>> a. no further action is
required and the purchase order shall be considered cancelled.



FAR 13.302-4(b)(1)

Acceptable methods for disseminating information on proposed contract actions include



a. assisting a local trade association in disseminating information to their members,
announcements in magazines at no cost, and phone calls.

b. synopsis in the government-wide point of entry (GPE), phone calls, and paid advertisements.

c. paid advertisements in newspapers published or printed in the District of Columbia when
supplies and services will not be supplied/furnished in or around the District of Columbia.

d. announcements in magazines at no cost, assisting a local trade association in disseminating
information to their members, and synopsis in the government-wide point of entry (GPE). -

, Answer>>> d. announcements in magazines at no cost, assisting a local trade association in
disseminating information to their members, and synopsis in the government-wide point of entry
(GPE).



FAR 5.101(a) & (b)

The government's policy is to try to resolve all contractual issues in controversy by



a. mutual agreement at the CO's level.

b. bilateral agreement at the CO's level.

c. mutual agreement at a level above the CO.

d. unilateral agreement at the CO's level. - Answer>>> a. mutual agreement at the CO's level.



FAR 33.204

The specific content of acquisition plans will vary, and are influenced primarily by which
factors?



a. the specific type of goods or services being acquired

b. the nature, circumstances, and stage of the acquisition

c. the ultimate government end-user of the goods or services

d. the type of contract and the scale of competition - Answer>>> b. the nature, circumstances,
and stage of the acquisition



FAR 7.105

Which of the following concerning electronic bids is true?

Geschreven voor

Instelling
CERTIFIED FEDERAL CONTRACTS MANAGER
Vak
CERTIFIED FEDERAL CONTRACTS MANAGER

Documentinformatie

Geüpload op
26 november 2025
Aantal pagina's
65
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EXCELLENCE8HUB Chamberlain School Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
60
Lid sinds
3 jaar
Aantal volgers
17
Documenten
1485
Laatst verkocht
3 weken geleden
Home of Test Banks , Flash cards, Notes, Exam (elaborations)Questions and Answers.

On this page you find all latest quality Test Banks, Flashcards, notes and examinations (elaborations) you can easily acquire at any place of interest at any comfortable time .Build your knowledge at MED EXCELLENCE HUB. Thank you for your reviews. Growth in knowledge is growth in our future.

4.3

13 beoordelingen

5
10
4
1
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen