Capacity - ANS maximum output rate of a production or service facility
Capacity planning - ANS process of determining the amount of capacity required to produce
in the future
Utilization - ANS actual output rate/available capacity
if effective capacity used -> efficient utilization
if design capacity used -> design utilization
Rough-Cut Capacity Planning - ANS process of converting the master production schedule
into requirements for key resources
* indicates sufficient capacity
Best way to determine the system capacity and system bottleneck - ANS walk the process
Scheduling - ANS specifies when labor, equipment, or facilities are needed to produce a
product or provide a service
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.
100% CORRECT ANSWERS LATEST
VERSION 2025/2026.
Capacity - ANS maximum output rate of a production or service facility
Capacity planning - ANS process of determining the amount of capacity required to produce
in the future
Utilization - ANS actual output rate/available capacity
if effective capacity used -> efficient utilization
if design capacity used -> design utilization
Rough-Cut Capacity Planning - ANS process of converting the master production schedule
into requirements for key resources
* indicates sufficient capacity
Best way to determine the system capacity and system bottleneck - ANS walk the process
Scheduling - ANS specifies when labor, equipment, or facilities are needed to produce a
product or provide a service