ANSWERS
AHJ - CORRECT ANSWERS ✔✔Abbreviation of authority having
|\ |\ |\ |\ |\ |\ |\ |\
jurisdiction. The building official, electrical inspector, fire marshal, |\ |\ |\ |\ |\ |\ |\
or other individuals or entities responsible for interpretation and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
enforcement of local building and electrical codes. (ITSIMM, page |\ |\ |\ |\ |\ |\ |\ |\ |\
A-1 to A-2) 02_PROFESSIONALISM AND PROJECT PLANNING
|\ |\ |\ |\ |\ |\
A drawings - CORRECT ANSWERS ✔✔Architectural drawings show
|\ |\ |\ |\ |\ |\ |\
a plan (top) view of each floor in a building. They include all
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
aspects of the physical construction of the buiding, which provide
|\ |\ |\ |\ |\ |\ |\ |\ |\
the detail for such items as wall types, elevations, rated
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
construction (fire and smoke), reflected ceiling plans,door |\ |\ |\ |\ |\ |\ |\
hardware schedule, exact floor penetration dimensions, |\ |\ |\ |\ |\ |\
cabinetry, and furnishings. If the architect employs interior |\ |\ |\ |\ |\ |\ |\ |\
designers, their work will be reflected on these drawings.(ITSIMM, |\ |\ |\ |\ |\ |\ |\ |\
page 10-5) 02_PROFESSIONALISM AND PROJECT PLANNING
|\ |\ |\ |\ |\ |\
Code - CORRECT ANSWERS ✔✔A rule or set of rules intended to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ensure safety during the installation and use of materials,
|\ |\ |\ |\ |\ |\ |\ |\ |\
components, fixtures, systems, premises, and related subjects. |\ |\ |\ |\ |\ |\ |\
Codes typically are invoked and enforced through government
|\ |\ |\ |\ |\ |\ |\ |\
regulation. (ITSIMM, page 3-52) 02_PROFESSIONALISM AND |\ |\ |\ |\ |\ |\
PROJECT PLANNING |\
E drawings - CORRECT ANSWERS ✔✔Electrical drawings are very
|\ |\ |\ |\ |\ |\ |\ |\ |\
important to ICT systems cabling installers. They indicate where
|\ |\ |\ |\ |\ |\ |\ |\ |\
the electrical services are installed inside the building and the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
, pathways that may be installed by the electrical contractor for
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
use by the cabling installation team. The drawings indicate the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
grounding system installed by the electrical contractor and the |\ |\ |\ |\ |\ |\ |\ |\ |\
location of supporting structures installed by the electrical
|\ |\ |\ |\ |\ |\ |\ |\
contractor (e.g., floor boxes, cable tray, surface raceway, poke- |\ |\ |\ |\ |\ |\ |\ |\
thrus, duct banks). (ITSIMM, page 10-5) 02_PROFESSIONALISM
|\ |\ |\ |\ |\ |\ |\
AND PROJECT PLANNING |\ |\
FP drawings - CORRECT ANSWERS ✔✔Fire protection drawings
|\ |\ |\ |\ |\ |\ |\ |\
show the size and route of fire suppression system piping and
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
associated fire suppression agent heads and nozzles within the |\ |\ |\ |\ |\ |\ |\ |\ |\
structures. (ITSIMM, page 10-5) 02_PROFESSIONALISM AND |\ |\ |\ |\ |\ |\
PROJECT PLANNING |\
ICT - CORRECT ANSWERS ✔✔Abbreviation of Information and
|\ |\ |\ |\ |\ |\ |\ |\
Communications Technology. (ITSIMM, page A-1) |\ |\ |\ |\ |\
02_PROFESSIONALISM AND PROJECT PLANNING |\ |\ |\
M drawings - CORRECT ANSWERS ✔✔Mechanical drawings
|\ |\ |\ |\ |\ |\ |\
indicate the size and route of the HVAC system ducts, air handler
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
units, chilled water piping, and refrigerant piping within the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
structures. (ITSIMM, page 10-5) 02_PROFESSIONALISM AND |\ |\ |\ |\ |\ |\
PROJECT PLANNING |\
P drawings - CORRECT ANSWERS ✔✔Plumbing drawings indicate
|\ |\ |\ |\ |\ |\ |\ |\
the size and route of potable water, specialized water, sanitary
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
sewer, and rainwater roof drain piping within the structures.
|\ |\ |\ |\ |\ |\ |\ |\ |\
(ITSIMM, page 10-5) 02_PROFESSIONALISM AND PROJECT |\ |\ |\ |\ |\ |\
PLANNING