Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

3RD CLASS STATIONARY STEAM ENGINEER LICENSE PREP QUESTIONS AND ANSWERS 2025

Beoordeling
5.0
(1)
Verkocht
1
Pagina's
21
Cijfer
A+
Geüpload op
29-11-2025
Geschreven in
2025/2026

3RD CLASS STATIONARY STEAM ENGINEER LICENSE PREP QUESTIONS AND ANSWERS 2025

Instelling
3RD CLASS STATIONARY STEAM
Vak
3RD CLASS STATIONARY STEAM

Voorbeeld van de inhoud

3RD CLASS STATIONARY STEAM ENGINEER LICENSE PREP QUESTIONS AND ANSWERS
2025



_________ are necessary for complete combustion - (ANSWER)time, temperature, mixture, and
atomization



if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - (ANSWER)214.7



a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The
blowdown is______psi - (ANSWER)12



an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-
generator - (ANSWER)steam turbine



a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam temperature of 500
degrees Fahrenheit. The steam produced is _______ steam - (ANSWER)superheated



the economizer on a boiler is used to _______ - (ANSWER)add heat to the feed water



blowers are normally used with________ boilers - (ANSWER)water tube



overheating of tubes on a boiler can be caused by________ - (ANSWER)scale on tubes



carbon dioxide in a condensate return system causes_________ - (ANSWER)channeling



a ________ pump is a positive displacement pump - (ANSWER)reciprocating



a boiler generating 6000 lb of steam/hr produces _______btu/hr - (ANSWER)6,000,000



a bottom blowdown is performed on a boiler to _____ - (ANSWER)discharge sludge and sediment



water columns are connected to the boiler with a minimum of _______" pipe - (ANSWER)1

,3RD CLASS STATIONARY STEAM ENGINEER LICENSE PREP QUESTIONS AND ANSWERS
2025




the minimum size of a water column blowdown valve is_______". - (ANSWER)3/4



the maximum size bottom blowdown valve on a boiler is_________". - (ANSWER)2 1/2



a ________ allows condensate to pass through, but stops Steam. - (ANSWER)a steam trap



when taking over a shift, the first thing to do is check the________ - (ANSWER)water level in each boiler



according to the asme code, a high-pressure boiler having more than 500 square feet of heating surface
shall have________ - (ANSWER)two or more safety valves



the probable cause of an increase in temperature of gases of combustion at the boiler Outlet is____ -
(ANSWER)dirty heating services



boilers in battery equipped with________ must have two main steam stop valves and a free-flowing
drain between them - (ANSWER)manhole openings



in order to be sure the gauge glass is indicating an accurate water level reading, the stationary engineer
should______ - (ANSWER)blowdown the gauge glass



a continuous blowdown line is located___ - (ANSWER)in the Steam and water drum well below the nowl



a temperature reading of 80 degrees Celsius is equal to_________°f - (ANSWER)176



a chimney temperature of 250 degrees Fahrenheit above steam temperature indicates_______ -
(ANSWER)poor efficiency



a manometer is red in________ - (ANSWER)inches of water

, 3RD CLASS STATIONARY STEAM ENGINEER LICENSE PREP QUESTIONS AND ANSWERS
2025




the boiling point of water will____ with an increase in pressure - (ANSWER)be raised



if a lather is not obtained when performing a soap hardness test, the water sample is_______ -
(ANSWER)hard



combustion efficiency can be increased when air is________ - (ANSWER)preheated



______ draft is produced by a fan located between the boiler and the chimney - (ANSWER)induced



the overspeed trip on a steam turbine should be tested ______ - (ANSWER)before putting the steam
turbine on-line



a high CO2 reading in the gases of combustion is a sign of____ - (ANSWER)High combustion efficiency



the purpose of chemically treating feedwater is to________ - (ANSWER)turn scale-forming salts to a non
adhering sludge



water in a d rating feed water heater is prevented from entering the steam line by a(n) _______. -
(ANSWER)Loop seal or internal overflow



a steam turbine operating at 3600 RPM will trip at_________ rpm - (ANSWER)3960



he steam line going to The Blowers is connected to the main ________ - (ANSWER)steam drum



before using blowers on a boiler,________ - (ANSWER)drain set blower lines



an accumulation of snow on the Fireside of a boiler tubes________ - (ANSWER)decreases boiler
efficiency

Geschreven voor

Instelling
3RD CLASS STATIONARY STEAM
Vak
3RD CLASS STATIONARY STEAM

Documentinformatie

Geüpload op
29 november 2025
Aantal pagina's
21
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$21.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
4 maanden geleden

5.0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Belaire Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2811
Lid sinds
1 jaar
Aantal volgers
2
Documenten
1352
Laatst verkocht
1 dag geleden

5.0

505 beoordelingen

5
488
4
12
3
5
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen