Introduction to Industrial Management
(IIM)
Total Marks - 70 Total Time – 3 hrs
SECTION A — Very Short Questions 1× 10 = 10
(MCQs, Fill in the Blanks, True/False, One-liners from scanned file) =×
1. Fill in the blank: A system that interacts with its environment is called an __________
system. ×
2. MCQ: In an organization, authority always flows:
(A) Upward (B) Downward (C) Horizontally (D) Diagonally
×
3. Define: Basic function (in Value Analysis).
×
4. MCQ: In PERT, the expected time TE is computed using:
(A) (O+M+P)/3 (B) (O+4M+P)/6 (C) (O+P)/2 (D) (4O+M+P)/6
5. Fill in the blank: Bin cards record only __________.
6. One-line: What is a critical activity?
7. MCQ: Which production system is used for highly customized products?
(A) Mass Production (B) Job Shop Production (C) Continuous Production (D)
Flow Production
8. Fill in the blank: In ABC analysis, “A” items are generally _________ in quantity but
_________ in value.
9. One-line: Name the Japanese workplace improvement method based on 5S.
10. MCQ: JIT is mainly focused on:
(A) High Inventory (B) Zero Defects (C) Zero Inventory (D) High Lead Time