Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ICC Vapor Recovery 1 Test Questions And Answers Verified 100% Correct

Beoordeling
-
Verkocht
-
Pagina's
14
Cijfer
A+
Geüpload op
02-12-2025
Geschreven in
2025/2026

ICC Vapor Recovery 1 Test Questions And Answers Verified 100% Correct The connection of vent risers aboveground to form a single vent opening is called a ____? a. manifold b. flow limiter c. pressure regulator d. pressure vac-vent - ANSWER -a. manifold When installing a Healy VP-1000 Vac-Motor the technician should do all EXCEPT ____ a. replace the nozzle b. wear eye protection c. properly barricade the area d. turn off power to the dispenser - ANSWER -a. replace the nozzle In the Healy EVR Phase II system, the VP-1000 pumps run at full speed only when ____? a. the nozzles on both side of the dispensers are picked up and not authorized b. the nozzle on one side is picked and authorized c. nozzles on both sides are picked up and authorized d. the dispensers on both side are authorized but the nozzles are not dispensing gas - ANSWER -c. nozzles on both sides are picked up and authorized Per EO VR-101-E, the P/V vent cap shall be allowed to ____ ft-lbs a. 10-20 b. 20-50 c. 50-75 d. 75-100 - ANSWER -b. 20-50 In regards to the Healy Phase II EVR System, when the power to the dispenser is on but no nozzles authorized, the VP-1000 motors will run ____? a. for a cycle every 10 minutes b. when the V/L is out of range c. when the ambient temperature is below 40 degrees F d. when the pressure of the underground tank exceeds 2 inches WC - ANSWER -c. when the ambient temperature is below 40 degrees F According to E0 VR-201-A, after installing a new spout assembly in the Healy 900 nozzle, the following test must be conducted, a. V/L b. nozzle bag test c. dispenser leak decay test d. nozzle dispensing shut-off test - ANSWER -d. nozzle dispensing shut-off test According to CP-201, condensate traps shall meet the following requirements EXCEPT: a. CARB certified b. capable of automatic evacuation of liquid c. installed at least below the UST tank level d. equipped with an alarm system in case of failure of the evacuation system - ANSWER -c. installed at least below the UST tank level The minimum internal diameter the underground vapor recovery line after the first manifold and before the tank is ____ inches. a. 1 1/2" b. 2" c. 3" d. 4" - ANSWER -c. 3" When installing the Phil-Tite Phase EVR I system, the installer should reference all of the following materials except: a. applicable Executive Order b. the list of definitions found in VR-101-E c. the Phil-Tite Phase I EVR equipment installation list d. the applicable installation, operation, & maintenance manual - ANSWER -b. the list of definitions found in VR-101-E Gasoline vapors are 3-4 times ____ than air a. lighter b. heavier c. more stable d. more buoyant - ANSWER -b. heavier To test the dispenser piping on the suction of a Healy Phase II system a ____ inch water column gauge is required. a. 0-2 b. 0-5 c. 0-100 d. 0-100 - ANSWER -d. 0-100 Flexible piping must be ____. a. of an approved type, may not be approved for vent lines b. may require a wider trench configuration c. evenly sloped, back towards tank d. all the above - ANSWER -d. all the above In PEI, RP-500, there is a procedure that involves Lockout/Tag out procedures. Which of the following is not part of the procedure?

Meer zien Lees minder
Instelling
ICC Vapor Recovery 1
Vak
ICC Vapor Recovery 1

Voorbeeld van de inhoud

ICC Vapor Recovery 1 Test Questions
And Answers Verified 100% Correct

The connection of vent risers aboveground to form a single vent opening is called
a ____?

a. manifold
b. flow limiter
c. pressure regulator
d. pressure vac-vent - ANSWER -a. manifold

When installing a Healy VP-1000 Vac-Motor the technician should do all
EXCEPT ____

a. replace the nozzle
b. wear eye protection
c. properly barricade the area
d. turn off power to the dispenser - ANSWER -a. replace the nozzle

In the Healy EVR Phase II system, the VP-1000 pumps run at full speed only
when ____?

a. the nozzles on both side of the dispensers are picked up and not authorized
b. the nozzle on one side is picked and authorized
c. nozzles on both sides are picked up and authorized
d. the dispensers on both side are authorized but the nozzles are not dispensing gas
- ANSWER -c. nozzles on both sides are picked up and authorized

Per EO VR-101-E, the P/V vent cap shall be allowed to ____ ft-lbs

a. 10-20
b. 20-50
c. 50-75

, d. 75-100 - ANSWER -b. 20-50

In regards to the Healy Phase II EVR System, when the power to the dispenser is
on but no nozzles authorized, the VP-1000 motors will run ____?

a. for a cycle every 10 minutes
b. when the V/L is out of range
c. when the ambient temperature is below 40 degrees F
d. when the pressure of the underground tank exceeds 2 inches WC - ANSWER -c.
when the ambient temperature is below 40 degrees F

According to E0 VR-201-A, after installing a new spout assembly in the Healy
900 nozzle, the following test must be conducted,

a. V/L
b. nozzle bag test
c. dispenser leak decay test
d. nozzle dispensing shut-off test - ANSWER -d. nozzle dispensing shut-off test

According to CP-201, condensate traps shall meet the following requirements
EXCEPT:

a. CARB certified
b. capable of automatic evacuation of liquid
c. installed at least below the UST tank level
d. equipped with an alarm system in case of failure of the evacuation system -
ANSWER -c. installed at least below the UST tank level

The minimum internal diameter the underground vapor recovery line after the first
manifold and before the tank is ____ inches.

a. 1 1/2"
b. 2"
c. 3"
d. 4" - ANSWER -c. 3"

Geschreven voor

Instelling
ICC Vapor Recovery 1
Vak
ICC Vapor Recovery 1

Documentinformatie

Geüpload op
2 december 2025
Aantal pagina's
14
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.09
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TopGradeGuru Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
15
Lid sinds
1 jaar
Aantal volgers
0
Documenten
2399
Laatst verkocht
1 maand geleden
GRADEHUB

We provide access to a wide range of professionally curated exams for students and educators. It offers high-quality, up-to-date assessment materials tailored to various subjects and academic levels. With instant downloads and affordable pricing, it\'s the go-to resource for exam preparation and academic success.

1.5

2 beoordelingen

5
0
4
0
3
0
2
1
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen